5311/22: The development will consist of the change of use of the ground, first and second floors from class 3 office use to class 8 for use as a health centre / clinic along with all associated works.
Block 7, Parkwest Business Campus, Parkwest, Dublin 12
DecisionGrant permission
Decided05 April 2023
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 2221/19The development will consist of the installation of a roof mounted solar photovoltaic panels and all ancillary works and services. / 0.2 km away / 01 April 2019Granted
- WEB1336/25The development will consist of the installation of four rapid electric vehicle charging stations and ancillary equipment within the car park of Plaza Park West, Dublin, including one fully accessible EV charging bay. / 0.3 km away / 15 April 2025Granted
- SD06A/0840Change of use of existing ancillary maintenance store to kitchen-dining room and existing kitchen to toilet-shower room, together with provision of window to side elevation in lieu of existing roller-shutter door. / 0.3 km away / 23 November 2006Granted
- SD25A/0301WThe development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the reconfiguration of plant and associated extracts, provision of a roof level package plantroom, provision of 2 no. backup landlord generators, reconfigured gantry associated with the 2 no. back-up landlord generators, and reconfiguration of solar PV panels; The provision of 2 no. pumproom buildings to accommodate process water and fire water with a gross floor area (GFA) of c. 44 sq.m and c. 105 sq.m; The provision of underground water process tanks located to the south of ICT Facility 1; The provision of a wastewater treatment skid located to the west of ICT Facility 1; Reconfiguration of car parking spaces resulting in an overall reduction of 1 no. car parking spaces from 44 no. car parking spaces to 43 no. car parking spaces; Relocation of permitted cycle parking from the north of ICT Facility 1 to the south of ICT Facility 1; Amendments to fenestration and arrangement of façade treatment to ICT Facility 1 and minor reconfiguration of the internal layout; and All associated and ancillary works. An EPA-Industrial Emissions Directive (IE) licence is required to facilitate the operation of the development. / 0.3 km away / 08 April 2026Granted
- SD06A/0719Retention of change of use for 136sq.m. of workshop space to office space. / 0.3 km away / 13 October 2006Granted
- SD08A/0456A 5.3 x 1.9 x 2.5m high stainless steel and glass bus shelter with 2 illuminated display panels. / 0.4 km away / 21 August 2008Granted
- 4435/24The development will consist of: The erection of two No. illuminated signs on the west and south facade of the existing building known as block 20 and all assocated site works. / 0.4 km away / 07 February 2025Granted
- S99A/0278Retention of kitchen, workshop and store at ground floor level and 2 no. offices, boardroom and a system store at first floor level. / 0.4 km away / 01 July 1999Granted