GrantedDecided 30 March 2020Dublin City Council

DSDZ2204/20: PROTECTED STRUCTURE: Permission is sought for the demolition of a non-original 3 storey over basement commercial building behind protected façade (c.1684.8m2 to be demolished) and the construction of a commercial building (c.3,714 GIA overall) extending to 8 storeys with setback 9th floor over existing basement consisting of office space at 1st to 8th floor level (c.2,073m2 NIA) and an entrance/shared office/townhall/café space (c.264m2 NIA) at ground floor level. The retained façade will be restored, repaired and repointed with new windows/doors as required. There is a terrace at 8th floor level and screened external plant is setback at roof level. Permission is also sought for all associated site development works, an ESB Substation (c.28m2) at ground floor level and the provision of 60 no. bicycle spaces, shower facilities, bin store and plant within the existing basement level.

No. 73, North Wall Quay, Dublin 1 (a Protected Structure RPS 5840)
DecisionGrant permission
Decided30 March 2020
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near No. 73, North Wall Quay, Dublin 1 (a Protected Structure RPS 5840)?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →