GrantedDecided 15 September 2023Dublin City Council

DSDZ4208/23: Permission for development on a site of 0.4834ha to amend Block No. 2 of a previously permitted scheme (Reg. Ref. DSDZ5296/22, which itself amends Reg. Ref. DSDZ2103/21, Reg. Ref. DSDZ3409/19 and Reg. Ref. DSDZ3780/17). (Permission (Reg. Ref. DSDZ5296/22) was on a larger site of 1.0432 hectares. (The difference in site area of 0.5598ha is due to the permitted decoupling of Block No. 2 from Block Nos. 1 and 3)). Permission Reg. Ref. DSDZ5296/22 permits the construction of 3 no. commercial office buildings totalling 67,903 sq m (including retail services (152 sq m) and gallery / exhibition (188 sq m)), identified as three blocks (Block Nos. 1-3) ranging in height from 5-storeys to 9-storeys and is valid until 21 June 2028. This application relates to a proposed development within a Strategic Development Zone Planning Scheme area, located within City Block No. 9, North Wall Quay and Mayor Street Upper, Dublin 1, bounded by North Wall Quay to the south, the residual City Block No. 9 lands of 1.4766 ha to the north and east and Castleforbes Road to the west as identified in the North Lotts & Grand Canal Dock Planning Scheme, 2014. The permitted Block No. 2 has a GFA of 42,632 sq m (comprising 30,470 sq m above ground; 3,659 sq m at lower ground floor and 8,503 sq m at basement levels). The overall Gross Floor Area of the proposed amendment scheme increases by 118 sq m to 42,750 sq m from that granted by permission Reg. Ref. DSDZ5296/22, comprising a decrease of 3 sq m at ground and above; an increase of 118 sq m at lower ground floor level and an increase of 3 sq m at basement levels. The amendment scheme will consist of the following: 1. Relocation and resizing of the gallery / exhibition entrance door along the southern facade (for fire compliance purposes); 2. Relocation of structural columns from the interior to the exterior of the structure along the southern and eastern facades to be clad in anodic bronze aluminium to match fins remainder of the facades; 3. Structural columns amended from internal vertical to internal inclined on the western facade at first floor level and at the south west of block No. 2 at second floor level; 4. Provision of glass balustrades edge protection to the perimeter of the ground level roof light on the eastern elevation; 5. Alterations to the northern facade comprising the reconfiguration of the ESB Substation facade as per ESB compliance requirements; 6. Increase in height in level 07 atrium rooflight on the southern elevation of 320mm at the highest point and 500mm at the lowest point; 7. Relocation of six car parking spaces from basement level 03 to basement level 02. In compliance with condition no. 16 (c) of the permission reg. ref. DSDZ5296/22 (relating to three blocks), some 41 no. bicycle parking spaces have been added to the 372 no. previously proposed - now providing for a new total 413 no. bicycle parking spaces in Block no. 2.

City Block 9, North Wall Quay, and Mayor Street Upper, Dublin 1
DecisionGrant permission
Decided15 September 2023
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near City Block 9, North Wall Quay, and Mayor Street Upper, Dublin 1?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →