DSDZ4642/22: The development will consist of change of use of this unit from coffee shop to office, with internal alterations to facilitate this change of use and all associated site works necessary to facilitate the development. This application relates to land within the North Lotts and Grand Canal docks strategic development zone.
Unit 3/4, Block D, Butler's Court, 77, Sir John Rogerson's Quay, Dublin 2
DecisionRefuse permission
Decided29 September 2022
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- DSDZ2308/19PERMISSION: For development at a site (c.0.05 ha), at Capital Dock, Block D, Green Street East and Benson Street, Dublin 2 and otherwise bounded generally by permitted development under Reg. Ref. DSDZ2546/15 (as amended) at Sir John Rogerson's Quay and State Street Bank to the north, Permitted Block C to the east, Benson Street to the west and Green Street East to the south. The proposed development comprises a change of use of a permitted ground floor unit (c157sq.m) from 'crèche' use to 'cafe/restaurant' use. The Block D building otherwise as previously permitted under DCC Reg. Ref. DSDZ2546/15, as amended by Reg. Ref. DSDZ2663/16 and Reg. Ref. DSDZ4102/16 and concurrent planning application Reg. Ref. DSDZ4732/18. This application relates to proposed development within the North Lotts & Grand Canal Dock Strategic Development Zone Planning Scheme area. / 0.1 km away / 30 July 2019Refused
- DSDZ2764/20Planning Permission at Capital Dock, Sir John Rogerson's Quay. Britain Quay and Green Street East and Nos. 10-12 Hanover Quay and No. 2 Green Street East, Dublin 2, for proposed development comprising: The allocation of 20 no. existing car parking spaces located at Basement Level -1, Capital Dock (DSDZ2145/18 refers), for use associated with a permitted office development (c.8,116 sq.m gfa) under construction at Nos. 10-12 Hanover Quay and No. 2 Green Street East (DSDZ3856/17 refers). This application relates to proposed development within the North Lotts & Grand Canal Dock Strategic Development Zone Planning Scheme area. / 0.2 km away / 21 July 2020Refused
- WEBDSDZ1350/25PROTECTED STRUCTURE: Planning permission at 9 Hanover Quay, and adjoining Grand Canal Dock, Dublin 2, both protected structures. This application relates to a proposed development within the North Lotts & Grand Canal Dock Strategic Development Zone Planning Scheme Area. The proposed development consists of the change of use from dwelling to mixed use café/bar with soundproof entertainment venue, 35 bedroom hotel, removal of non-historic internal walls, insertion of floor openings for lifts and stairs, enlargement of one opening in the north wall of the protected structure, raising roof truss level at No 9 Hanover Quay, demolition of modern conservatory and replacement with a building adjoining the protected stone malt house building, with access to quayside, two-storey extension above existing roofline, green roof with solar panels, extended basement, and ancillary siteworks to facilitate access to the venue. / 0.2 km away / 16 April 2025Refused
- DSDZ2265/20PROTECTED STRUCTURE: The site is bound to the north by Mayor Street Upper, to the east by New Wapping Street, to the south by North Wall Quay and to the west by an unnamed street. The application site includes the former British Rail Hotel at 58-59 North Wall Quay, a protected structure (RPS 5838), and associated granite walls, railings, gates, and adjoining setts in cul-de-sac, which are also protected structures (RPS 5839). The proposed amendments result in a total gross floor area of c.66,856sq.m. (excluding basement c. 7,948 sq.m. and sub-basement c. 2,503 sq.m.) comprising of c. 10,066 sq.m. of hotel and associates uses, c. 55,756sq.m. of office use, c. 1,034sq.m. of retail/restaurant/café uses, 170 sq.m. of community use, above a lower ground floor and 2 no. basement levels (c. 10,541sq.m.). The proposed development will result in an increase in floor area from c.58,670 to c.66,856sq.m. The application relates to a proposed development within a Strategic Development Zone Planning Scheme area. The proposed amendments comprise of the following: The provision of 2 no. additional floors to Building 1B fronting Station Square increasing the building height from 7no. storeys (31.8m) to 9no. storeys (40.25m) with a set back 7th, 8th and 9th no. storey. The additional floors comprise of 2 no. set back floors at 8th and 9th storey. The provision of 2 no. additional storeys to Building 2 fronting Station Square increasing the building height from 9 no. storeys (35.35m) to 11 no. storeys (42.1m) with a set back 8th, 9th and 10th storey and a further set back 11th storey. It is also proposed to revise the northern elevation of building 2 at ground floor level. The proposed amendments will result in an increase in the number of bedrooms permitted in the hotel from 204 no. to 223 no. The provision of 2 no. additional storeys to Building 3 increasing the building height from 7 no. storeys (33.1m) to 9 no. storeys (41.7m). The amendments to Building 3 will increase the floor plate of 7th storey and will provide for 2 no. additional set back floors. The proposed development will also include the provision of an extended community facility at the mezzanine level of building 3. The provision of 3no. additional storeys to Building 4 increasing the building height from 9 no. storeys (39.78m) to 12 no. storeys (52.02m) with a set back 10th,11th and 12th storey. The 8th and 9th storey will be extended. The additional floors will be set back from 10th to 12th storey. The proposal also provides for a reconfiguration of the 170sqm community space to the north of Building 3; the extension of the restaurant to lower ground floor of Building 2 and increased sanitary facilities throughout, revised landscaping proposals at lower ground and ground floor level, a revised roof profile to all buildings 1B, 2, 3 and 4 to accommodate revision to building heights, plant areas, SUDs, revised internal layouts to accommodate the additional floors, amendments to the elevations as a result of the additional floors and all associated site development works necessary to facilitate the development. / 0.3 km away / 16 April 2020Refused
- DSDZ3173/19PROTECTED STRUCTURE: Amendments to a previously permitted development under, Reg. Ref. DSDZ 2661/17 as previously amended by Reg. Ref. DSDZ4184/18 for development at a site of 1.35 hectares located at the junction of North Wall Quay and New Wapping Street, Salesforce Tower, Station Square, City Block 7, Spencer Dock, Dublin 1. The site is bound to the north by Mayor Street Upper, to the east by New Wapping Street, to the south by North Wall Quay and to the west by an unnamed street. The application site includes the former British Rail Hotel at 58-59 North Wall Quay, a protected structure (RPS 5838), and associated granite walls, railings, gates and adjoining setts in cul-de-sac, which are also protected structures (RPS 5839). The proposed amendments result in a total gross floor area of c. 72,559 sq.m. (excluding basement c. 7,948 sq.m and sub-basement c. 2,503 sq.m.) comprising of c. 10,986 sq.m. of hotel and associates uses, c. 60,259 sq.m. of office use, c. 1,152 sq.m. of retail / restaurant / café uses, 170 sq.m. of community use, above a lower ground floor and 2 no. basement levels (c. 10,541 sq.m.). The proposed development will result in an increase in floor area from c. 58,670 to c. 72,559 sq.m. The application relates to a proposed development within a Strategic Development Zone Planning Scheme area. The proposed amendments comprise of the following: The provision of 3 no. additional floors to building 1B fronting Station Square increasing the building height from 7 no. storeys to 10 no. storeys with a setback 8th and 9th floor. The additional floors comprise of 2 no. typical floors at 6th and 7th floor level and 1 no. set back floor at 8th floor level. The additional floors at 6th and 7th floor level will result in the provision of 2 no. additional bridge connections on each level linking to building 4. The provision of 2 no. additional storeys to building 2 fronting Station Square increasing the building height from 9 no. storeys to 11 no. storeys. The additional floors comprise of 2 no. typical floors at 5th and 6th floor level. It is also proposed to revise the northern elevation of building 2 at ground floor level. The proposed amendments will result in an increase in the number of bedrooms permitted in the hotel from 204 no. to 264 no. The provision of 2 no. additional storeys to building 3 increasing the building height from 7 no. storeys to 9 no. storeys. The additional floors will comprise of 2 no. typical floors at 4th and 5th floor level. The additional floors will result in the provision of 2 no. additional link bridges from building 3 to building 4. The proposed development will also include the provision of an extended community facility at the mezzanine level of building 3. The provision of 2 no. additional storeys to building 4 increasing the building height from 9 storeys to 11 no. storeys. The additional floors comprise of 2 no. typical floors at 6th and 7th floor levels. The additional floors will result in the provision of 2 no. additional bridge connections on each level linking to building 1B. The proposed amendments also include the provision of revised landscaping proposals at lower ground floors level, revised roof profile of all buildings 1B, 2, 3 and 4 to accommodate revision to plant areas, SUDs, revised internal layouts to accommodate the additional floors, amendments to the elevations as a result of the additional floors and all associated site development works necessary to facilitate the development. / 0.3 km away / 29 July 2019Refused
- DSDZ2088/19PROTECTED STRUCTURE:Amendments to a previously permitted development under Reg. Ref. DSDZ2661/17 as previously amended by Reg. Ref. DSDZ4184/18 for development at a site of 1.35 hectares located at the junction of North Wall Quay and New Wapping Street, Spencer Dock, Dublin 1. The site is bound to the north by Mayor Street Upper, to the east by New Wapping Street, to the south by North Wall Quay, and to the west by an unnamed street. The application site includes the former British Rail Hotel at 58-59 North Wall Quay, a protected structure (RPS 5838), and associated granite walls, railings, gates, and adjoining setts in cul-de-sac, which are also protected structures (RPS 5839). The proposed amendments in a total gross floor area of c.72,559 sq.m. (excluding basement c. 7,948 sq.m. and sub-basement c. 2,503 sq.m.) comprising of c. 10,986 sq.m. of hotel and associates uses, c. 60,259 sq.m. of office use, c. 1,152 sq.m. of retail / restaurant / cafe uses, 170 sq.m. of community use, above a lower ground floor and 2 no. basement levels (c. 10,541 sq.m.). The proposed development will result in an increase in floor area from c. 58,670 to c. 72,559 sq.m. The application relates to a proposed development within a Strategic Development Zone Planning Scheme area. The proposed amendments comprise of the following: The provision of 3 no. additional floors to building 1B increasing the building height from 7 no. storeys to 10 no. storeys with a setback 8th and 9th floor. The additional floors comprise of 2 no. typical floors at 6th and 7th floor level and 1 no. set back floor at 8th floor level. The additional floors at 6th and 7th floor level will result in the provision of 2 no. additional bridge connections on each level linking to building 4. The provision of 2 no. additional storeys to building 2 increasing the building height from 9 no. storeys to 11 no. storeys. The additional floors comprise of 2 no. typical floors at 5th and 6th floor level. It is proposed to revise the northern elevation of building 2 at ground floor level. The proposed amendments will result in an increase in the number of bedrooms permitted in the hotel from 204 no. to 264 no. The provision of 2 no. additional storeys to building 3 increasing the building height from 7 no. storeys to 9 no. storeys. The additional floors will comprise of 3 no. typical floors at 4th and 5th floor level. The additional floors will result in the provision of 2 no. additional link bridges from building 3 to building 4. The proposed development also include the provision of an extended community facility at the mezzanine level of building 3. The provision of 2 no. additional storeys to building 4 increasing the building height from 9 no. storeys to 11 no. storeys. The additional floors comprise of 2 no. typical floors at 6th and 7th floor levels. The additional floors will result in the provision of 2 no. additional bridge connections on each level linking to building 1B. The proposed amendments also include the provision of revised landscaping proposals at lower ground floor level, revised roof profile of all buildings 1B, 2, 3 and 4 to accommodate revision to plant areas, SUDs, revised internal layouts to accommodate the additional floors, amendments to the elevations as a result of the additional floors and all associated site development works necessary to facilitate the development. / 0.3 km away / 31 May 2019Refused
- DSDZ3377/19Planning permission is sought for change of use of 2 no. 3 bedroom apartments into short term letting use. / 0.4 km away / 22 August 2019Refused
- DSDZ3046/20Planning Permission for development at a site of 0.17 ha at The Marker Hotel, Grand Canal Square, Docklands, Dublin 2. The site is bound by Misery Hill to the south, Hibernian Road to the west, Chimney Park to the north and Forbes St. to the east. The development consists of the following: construction of new illuminated signage and hotel logo on existing rooftop terrace and all associated site works. / 0.4 km away / 11 September 2020Refused