PWSDZ3207/21: Permission for development for a mixed use development on a site of 15.3 hectares (including some 0.2 hectares of public domain on Sean Moore Road and the junction with Pine Road), focused primarily, but not exclusively, on a net site area of 2.4 hectares (identified as within the A3 Lands) in the Poolbeg West Strategic Development Zone Planning Scheme (April 2019). The overall site is bounded to the north west by Sean Moore Road, to the north east by South Bank Road, to the south east by Dublin Port lands and Dublin Bay, and to the south west by Sean Moore Park. The overall site subsumes the 4.3 hectares site of the infrastructure permission (Parent Permission) (Reg. Ref. PWSDZ3270-19) for which Dublin City Council issued a Notification of Final Decision (10-year permission) on 28 January 2020, permitting, streets, transportation, water services and utilities' infrastructure, public realm and public amenity spaces; and temporary landscaping of a school site, to facilitate Phase 1 development as provided for under the approved Poolbeg West SDZ Planning Scheme. The proposed development will consist of: amendment to Permission Register Reference PWSDZ3270/19 in those areas where the net site of 2.4 hectares overlaps with the boundaries of the earlier 4.3 hectare infrastructure permission (including amendments to the streets to be taken in charge, amendments to permitted vehicular and basement access points, materials, urban tree locations and landscaping, and changes in level for permitted streets, parks and public realm and public amenity spaces); and the construction of a residential and mixed-use scheme comprising a floor area of 61,310 sq m (53,048 sq m above basement, together with a basement undercroft area of 8262 sqm, comprising 4 No. blocks (identified as Blocks 0, M and K (with Block M comprising two separate structures: a larger block and a smaller townhouse block) to provide: 600 No, apartment units and associated residential amenity facilities; a childcare facility; café restaurant unit; and two retail units; together with associated infrastructural works on the overall site. The 600 No apartment units will consist of: 304 No, apartment units; 144 No. 'Build-To-Rent' apartments (including resident support facilities and resident services and amenities (as per the requirements of the Sustainable Urban Housing: Design Standards for New Apartments (December 2020); 90 No. affordable housing apartments; and 62 No. social housing apartments. (The social and affordable housing is provided in accordance with Objective H7 of the Planning Scheme.) The proposed development will consist of: • Blocks K, M and O ranging in height from 3 - 16 storeys over basement undercroft to provide 600 No. apartment units (with balconies terraces to be provided on all elevations at all levels for each residential block, consisting of: 32 No. studio units; 267 No. 1-bedroom units; 245 No. 2-bedroom units; and 56 No. 3 bedroom units (for the avoidance of doubt, Section 11.5.1 of the Planning Scheme clarifies the description of 'height' in Figure 11.3 to be taken from the constructed ground floor level; references to 'basement' and 'undercroft', respectively, are interchangeable given the changes in level across the site); • The provision of 804 sq m of residential amenity facilities (to include a gym, lounge, meeting room, cinema room and other private amenities.) • A childcare facility (458 sq m) located at the ground floor of Block k providing c.80 No. childcare places, and an outdoor play area of c.200 sq m; • 2 No, retail units located at the ground floor of Block K (314 sq m (82 sq m and 232 sqm); • 1 café restaurant located at the ground floor of Block K (97 sq m); • A total of 166 No. car parking spaces (with 128 No. located at basement level with vehicular access from the ground floor of Block M from the new adjacent side street, and the provision of 38 No. on-street car parking spaces); • Provision of 961 No. bicycle parking spaces (911 No. long-stay bicycle parking spaces located at basement and surface level; and 50 No. short-stay bicycle parking spaces located at surface level); • Plant rooms and resident storage spaces located at basement level; • Landscaped open spaces to comprise 4052 sq m of residential communal courtyards (incl. children's play areas), and roof terraces to Block K (4th & 7th Floor), Block M (3rd & 6th Floor) and Block O (8th & 16th Floor); and • 1 No. ESB substation located within each of the ground floors of Block O (32 sqm) and M (32 sq m), and 2 No. ESB substations located within the ground floor of Block K (64 sq m). The proposed development will also include the provision of additional streets and site services, hard and soft landscaping, pedestrian and cycle links, boundary treatments, tree removal and tree planting, interim site hoarding, public lighting, green roofs, commercial and residential waste facilities, piped site wide services (including a temporary attenuation detention basin to serve Phase One) and all ancillary works and services necessary to facilitate construction and operation. This application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS).
Bounded to the north west by Sean Moore Road, to the north east by South Bank Road, to the south east by Dublin Port lands and Dublin Bay, and to the south west by Sean Moore Park including former Irish Glass Bottle Site
DecisionGrant permission
Decided24 March 2022
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- PWSDZ4121/21PERMISSION and RETENTION: Permission for development to amend the Parent Permission and for retention permission for development on a site of c. 15.06 hectares on lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4. The site is located within the ''A Lands' sector'' of the Poolbeg West Strategic Development Zone Planning Scheme (April 2019) The overall site includes some 4.3 hectares of land for which a ten year permission for enabling and infrastructual works was granted in January 2020. (Reg. Ref. PWSDZ3270/19; the ''Parent Permission'') The element of the scheme for which retention permission for development is sought consists of the removal of two sections of tree cover cumulatively-consisting of some 100 No. trees. The first section of tree cover (some 9 No. trees) was located along South Bank Road running east to west along the northern site boundary, whilst the second section (some 91 No. trees) was located internally within the centre of the site running south to north parallel to the east and west site boundaries ( a mixture of primarily of Lawson Cypress and Lombardy Poplar). Whilst the Planning Scheme facilitates and the Parent Permission permitted the removal of some trees, these two sections of additional tree cover were removed in contravention of Condition No. 22 of Planning Permission Reg. Ref. PWSDZ3270/19. The element of the scheme for which permission for development is sought will consist of: amendments to the ''Parent Permission'' (PWSDZ3270/19) to provide temporarily: three rows of tree cover and associated landscaping consisting of some 100 No. native trees (a mixture of Crab Apple, Field Maple, Hawthorn, Rowan, Wild Cherry and Black Alder); 1,183 sq m of native understory whip mix (a mixture of Blackthorn, Crab Apple, Elderberry, Hazel, Holly, Spindle and Hawthorn); and 1,498 sq m of native wild flowers, located within the boundary of the permitted Village Green, to mitigate against the biodiversity loss associated with the removal of trees on site (the temporary measure to be in place until the resolution of Condition No. 19 of Planning Permission Reg. Ref. PWSDZ3270/19, which requires agreement between the Planning Authority and the Applicant in relation to the final landscape design of the permitted Village Green);the erection of rabbit-proof fencing around the proposed trees and 2 No. associated maintenance access gates; and for all associated works above and below ground. / 0.0 km away / 29 June 2022Granted
- WEBPWSDZ1571/25Pembroke Beach DAC intends to apply for permission for development for a 228 No. bedroom Hotel development (referred to as Phase 2B) (including a café, licenced bar / restaurant, business centre and ancillary elements) on this site of 15.06ha including lands known as the former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4, focused primarily on a net site area of 0.211ha (identified as within the 'A1 Lands') in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019) (as amended). The overall site is bounded to the: north-west by Sean Moore Road; north-east by South Bank Road; south-east by Dublin Port lands and Dublin Bay; and south-west by Sean Moore Park. The overall site subsumes the 4.3ha site of the 'Infrastructure Permission' (Reg. Ref. PWSDZ3270/19) for which Dublin City Council issued a Notification of Final Decision (10-year Permission) on 28 January 2020, permitting streets, transportation, water services and utilities' infrastructure; public realm and public amenity spaces (including the Village Green and Dog Park); and temporary landscaping of a school site, to facilitate Phase 1 development as provided for under the Poolbeg West SDZ Planning Scheme (2019) (as amended) as approved by An Bord Pleanála. The proposed Phase 2B Hotel Scheme development will consist of: • Construction of a 228 No. bedroom Hotel development ('Block Q') (10,593 sq m GFA (excluding basement)) comprising a 20 No. storey landmark tower (with set-back storey at Sixteenth Floor Level 16) over two levels of basement (2,054 sq m), to provide: Hotel and ancillary uses, café, licenced bar / restaurant and ancillary spaces, business centre; and ancillary back-of-house facilities / spaces (including ESB Substation and associated ancillary rooms, bin store, laundry store, staff changing rooms, staff canteen, staff office and sprinkler tank and associated spaces). • Provision of 8 No. car parking spaces (including 1 No. accessible car parking spaces) and 1 No. service vehicle delivery bay at Basement Level -01, provision of 24 No. secure long-stay bicycle parking spaces for staff at Basement Level -01, and provision of 16 No. new short-stay bicycle parking spaces at surface level for visitors and provision of 1 No. new cargo bicycle parking space at surface level to service the proposed Hotel. • Amendment of the permitted Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24) and Phase A Commercial Scheme (Reg. Ref. PWSDZ3798/24): • In those external landscaped areas at Ground Floor Level in the immediate curtilage of the proposed Phase 2B Hotel Scheme site (including 'Gabbard Street' and 'South Bank Link Street') (within the focused site area) to facilitate amendments to permitted layouts, including the omission of 1 No. permitted EV-charging car parking space, the relocation of 1 No. accessible car parking space and 1 No. EV-charging car parking space, the relocation of 20 No. permitted short-stay bicycle parking spaces; provision of 1 No. new loading / pick-up/drop-off bay; addition of an access point on South Bank Link Street for proposed ESB substation, materials, urban tree locations and landscaping; • At substructure level to facilitate connections for vehicular movements, pedestrian movements and services between the permitted and proposed substructures. Accessing and servicing of the proposed Phase 2B Hotel Scheme development will be by way of 'Gabbard Street' (previously permitted under the Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24) and the Phase A Commercial Scheme (Reg. Ref. PWSDZ3798/24) and also by the permitted vehicular ramp on 'Ouzel Street' to / from the basement of the permitted Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24). This Application will be accompanied by a Natura Impact Statement (NIS). / 0.0 km away / 30 September 2025Granted
- WEBPWSDZ2252/24Permission for development comprising modifications to a permitted mixed-use development (referred to as "Phase 1") located at a site of c. 15.1 ha (with a focussed area of c. 0.84 ha) and is identified as being within the "A3" and "A4" Lands in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The wider site also includes the lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4. The modifications relate to the Meanwhile Uses (MWU) ‘Cultural Hub’, permitted under Dublin City Council Planning Reference PWSDZ3207/21 (and amended through Planning Ref. PWSDZ4276/23, PWSDZ3461/24, and PWSDZ3468/24). The proposed modifications consist of the omission of the Meanwhile Uses ‘Cultural Hub’, and its ancillary development, from the ‘Phase 1’ and wider masterplan development, and the extension of temporary hoarding along the Central Boulevard, and all associated works. / 0.0 km away / 26 November 2024Granted
- PWSDZ3062/24For the construction of a 6 storey structure to accommodate a multi-functional Community Hub and an Innovation Hub (12,556 sqm GFA) (referred to as Block P, accommodating community, innovation (office), leisure, cultural, artistic, café, educational and library uses) on a site of 15.06 hectares (identified as ‘Glass Bottle’) including lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4, focussed primarily, but not exclusively, on a net site area of 0.4523 hectares in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The overall site is bounded to the north-west by Sean Moore Road, to the north-east by South Bank Road, to the south-east by Dublin Port lands and Dublin Bay, and to the south-west by Sean Moore Park. The Block P structure is bounded to the north-west by the permitted Blocks O and M, to the north-east by the school site, to the south-east by the permitted Village Green and to the south-west by Clanna Gael Fontenoy CLG. The overall site subsumes the 4.3 hectare site of the Infrastructure Permission (‘Parent Permission’) (Reg. Ref. PWSDZ3270/19) for which Dublin City Council issued a Notification of Final Decision (10-year permission) on 28 January 2020. The infrastructure Permission (Reg. Ref. PWSDZ3270/19) permits: streets, transportation, water services and utilities infrastructure; public realm and public amenity spaces (including the Village Green and a Dog Park); and temporary landscaping of a school site, all to facilitate Phase 1 development as provided for under the approved Poolbeg West SDZ Planning Scheme. The proposed Block P development will consist of: - Amendment of Permission Register Reference PWSDZ3270/19 in those areas where the net site of 0.4523 hectares overlaps with the boundaries of the earlier 4.3 hectare Infrastructure Permission (Reg. Ref. PWSDZ3270/19) to facilitate amendments to materials, urban tree locations and landscaping, and to facilitate the change in levels between the western edge of the permitted Village Green and the proposed Block P together with public realm and public amenity space; - Amendment of Permission Register Reference PWSDZ3207/21 at the permitted local street (side street) identified as Holbrook Street where the net site area of 0.4523 hectares overlaps with the boundaries of the earlier 4.46 hectares’ focussed site area of the Phase 1 Permission (Reg. Ref. PWSDZ3207/21) to facilitate the provision of on-street bicycle parking; and - the construction of a multi-functional Community Hub and an Innovation Hub (12,556 sqm GFA) comprising a single 6-storey Block (with set-backs at Levels 3, 4 and 5 including set-back accessible roof terraces at 5th floor level, roof amenity space (including an enclosed basketball court) and roof level plant) to provide: community and educational uses (2,863 sqm GFA); a Community/Innovation Centre (including café) (1,785 sqm GFA), cultural uses (678 sqm GFA) including (20 No. Artists’ Studios (13 No. individual Artists’ Studios and 7 No.-equivalent Shared Artists’ Studio/Exhibition Space)); Innovation Hub (office) (7,058 sqm GFA) (including bike storage and changing facilities); and ancillary back-of-house spaces/facilities (172 sq m) including ESB substation and associated MV switchroom, tenant landlord switchroom, transformer room and telecom room; and bin stores). The proposed Block P development will also consist of the: - Provision of 5 No. new on-street car parking spaces (incl. 2 No. Accessible car parking spaces) and 1 No. on-street loading/taxi bay; and - Provision of 219 No. bicycle parking spaces (147 No. long-stay standard bicycle parking spaces located at the Innovation Hub Bike Store; 70 No. short-stay standard bicycle parking spaces located on-street at surface level; and 2 No. cargo bicycle parking spaces located at surface level). Access and servicing of the proposed Block P development will be by way of the permitted Local Street (Side Street) identified on the emerging Masterplan as “Holbrook Street” (as included in the Permitted Phase 1 (Reg. Ref. PWSDZ3207/21) and Phase 1B (Reg. Ref. PWSDZ3406/22) Schemes) and by the Coastal Link to be delivered as part of this development between Holbrook Street and the Village Green (permitted under the ‘Parent Permission’ (Reg. Ref. PWSDZ3270/19). The proposed development will also consist of the provision of: hard and soft landscaping incl. Coastal Link Planting, and roof terraces; publicly-accessible roof amenity space; a mural on the south-east elevation; pedestrian and cycle links; boundary treatments; tree removal and tree planting; interim site hoarding; public lighting; green and blue roofs; piped site wide services; and all ancillary works and services necessary to facilitate construction and operation. This application will be accompanied by a Natural Impact Statement (NIS). / 0.0 km away / 13 November 2024Granted
- PWSDZ3798/24Planning permission for development of an office and mixed-use scheme (Referred to as Phase A Commercial) on an infill site of c.15.08 hectares (with a net focused site area of c. 1.75 ha) of land within the former Irish Glass Bottle (IGB) and Fabrizia sites on Sean Moore Road, Dublin 4 (including some 198 sq metres of public domain on Southbank Road to accommodate vehicle and pedestrian access). The site is identified as within the A1 Lands in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The overall site is bounded to the north-west by Sean Moore Road, to the north-east by South Bank Road, to the south-east by Dublin Port lands and Dublin Bay, and to the south-west by Sean Moore Park. The overall site subsumes the 4.3 hectares site of the infrastructure permission (Parent Permission) (Reg. Ref. PWSDZ3270/19) for which Dublin City Council issued a Notification of Final Decision (10-year permission) on 28 January 2020, permitting: streets, transportation, water services and utilities’ infrastructure; public realm and public amenity spaces; and temporary landscaping of a school site, to facilitate Phase 1 development as provided for under the approved Poolbeg West SDZ Planning Scheme. The proposed development will consist of an office and mixed-use scheme with a total GFA of 46,101 sq m (excl. basement / undercroft UC-02) comprising 2 No. blocks (identified as Blocks A and B). The proposed development will consist of: Block A (includes Block AA & AB) of 26,254 sq m and ranging in height from 5-7 storeys over basement/undercroft carparking to include double height (UC-01 & 00 Level) ground floor reception, office, a restaurant/ bar, bakery/ café and event space with the upper floors to be used as offices. The offices have been designed to be suitable for a single user or multiple users with subdivisions. Block B of 19,847 sq m, and ranging in height from 5-12 storeys over basement/undercroft car parking to include double height (UC-01 & 00 Level) ground floor reception, games bar and office with the upper floors to be used as offices. The offices have been designed to be suitable for a single user or multiple users with subdivisions. The UC-01 level of Block A includes café, sports and recreation area, collaborative office, storage and building services. The UC-01 level of Block B includes collaborative office, management facilities and building services. Each office block has a number of amenity terraces including at 1st, 3rd, 4th, 5th, 6th and roof level in Block A and at 4th and 6th floor level in Block B. A total of 77 no. commercial car parking spaces (incl. 4 no. disabled access spaces & 16 no. EV spaces) and 4 no. motorbike spaces, located at basement level with vehicular access from the street level (Block A north eastern elevation), and the provision of 27 no. on-street car parking spaces (incl. 7 no. EV spaces and 6 no. disabled access spaces). Provision of 616 no. bicycle parking spaces located at basement level with bicycle ramp access from street level and 100 no. short-stay standard bicycle parking spaces located at surface level. Plant rooms, building services and energy centres, water tank, sprinkler rooms, tenant rooms, kitchenette, parcel/ courier store, archive store, bin stores, bicycle stores, lockers, showers, changing facilities, facilities management and games bar storage located at basement/ UC-01 level. Provision of public realm spaces including 1 no. public square (Pembroke Square), Glass Bottle Lane and public amenity spaces (totalling 1,920 sq m). Two new local/side streets (Pembroke Place & Glass Bottle Place) connecting to South Bank Road. The provision of the South Bank Link Road as identified in the SDZ Planning Scheme. The proposed development will include hard and soft landscaping, pedestrian and cycle links, boundary treatments, tree planting, public lighting, green roofs, solar pv panels, and all ancillary works and services necessary to facilitate construction and operation. The scheme also provides for an option which includes for temporary site hoarding, and cycle lane alongside Sean Moore Road, should the proposed development proceed ahead of the adjoining Phase 2 residential proposal commencing. This application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS). / 0.0 km away / 18 October 2024Granted
- PWSDZ3700/24Pembroke Beach DAC intends to apply for permission for development for a mixed used development (referred to as Phase 2) on this site of 15.06 hectares including lands known as the Former Irish Glass bottle & Fabrizia Sites, Poolbeg West, Dublin 4, focused primarily on a net site area of 1.99 hectares (identified as within the A1 Lands) in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The proposed Phase 2 development will consist of: amendment to permission Register Reference PWSDZ3270/19 and PWSDZ3207/21 in those areas where the net site of 1.99 hectares overlaps with the boundaries to the earlier permitted developments (including amendment to the urban tree plant along the Sean Moore Road interface & minor amendment to permitted public realm at the junction between Central Boulevard and South Bank Link Road) and the construction of a residential and mixed use scheme comprising an above ground gross floor area (GFA) of C. 48,648 sq.m., together with a basement/undercroft area of c. 10,654 sq.m., comprising 5 no. blocks (identified as blocks D1, D2, E1, E2, E2A) to provide: 502 no. apartment units and associated residential amenity facilities; a childcare facility; 3 no. Retail/ Food & Beverage units; 3 no. Retail Units, 2 no. Food/ beverage units; Health Facility; basement carparking; together with associated infrastructural works on the overall site. The proposed development will also include provision of the South Bank Link Road as identified in the SDZ Planning Scheme. Access and servicing of the proposed Phase 2 development will be by way of the central boulevard as permitted (subject to compliance with Condition No. 24e) in the Phase 1 planning permission (PWSDZ3207/21) which also amends the infrastructure permission (Parent Permission) (Reg. Ref. PWSDZ3270/19) amongst other things. An additional access for emergency vehicles only with retractable bollards will be provided at the junction of Bloom Street and Sean Moore Road. The proposed Phase 2 development will consist of: -5 no. Blocks (D1, D2, E1, E2, E2A) ranging in height between 6 and 7 storeys with 8 storey setback over basement/undercroft to provide 502 no. apartment units (with balconies/terraces to be provided on all elevations at all levels for each residential block), consisting of: 216 no. 1-bedroom units; 245 no. 2-bedroom units and 41 no. 3-bedroom units (for the avoidance of doubt, Section 11.5.1 of the Planning Scheme clarifies the description of 'height' in Figure 11.3 to be taken from the constructed ground floor level; references to 'basement' and 'undercroft', respectively, are interchangeable given the changes in level across the site); -The provision of c.740 sq.m. of residential amenity facilities within Block E1 (to include a tenant reception of with admin support spaces, shared work space, Residents Lounge, Events space, Library/ Film Room, Dining Kitchen & meeting room) -A childcare facility (c. 412 sq.m) located at the ground floor of block D1 providing c. 92 no. childcare places and an outdoor play area of c. 199 sq.m; -A health centre at ground floor of Block D1 (c. 202 sq.m.); -3 no. retail/food and beverages spaces & 1 no. retail spaces located at the ground floor of Blocks D1, D2 (total GFA c. 1,153 sq. m); -2 no. retail spaces and 2 no. food and beverage spaces located at the ground floor of Blocks E1, E2, E2A (total GFA c. 1,249 sq. m); - A total of 139 no. car parking spaces; 121 car parking spaces located at basement level (incl. 7 no. accessible spaces (2 of which are accessible/EV spaces) & 21 no EV spaces, 8 no. car share parking spaces (2 of which are car share/EV spaces), 4 no. crèche parking spaces, 4 no. heath centre parking space & 4 no. retail parking spaces located at basement level with vehicular access from the street level (Block D1/D2 south eastern elevation); the provision of 18 no. on street car parking spaces (incl. 5 no. EV on-street car parking spaces and 7 no. accessible spaces) and 5 no. loading bays. (Note that 6 no. surface car parking spaces along South Bank Link Road will not be accessible until vehicular access from South Bank Road is provided at a future date); -Provision of 906 no. bicycle parking spaces; 816 no. long stay stand bicycle parking spaces located at basement level (incl. 6 no. crèche, 24 no. retail, 20. no. cargo spaces and 28 no. e-bike spaces); 90 no. short-stay standard bicycle parking spaces located at surface level (70 no. residential (incl. 10 no. cargo bike spaces), 20 no. non-residential); -Plant rooms, resident storage spaces, bin stores, bicycle stores, water storage, sprinkler rooms. laundry located at basement level; -Landscaped open spaces to comprise residential communal courtyards incl. children's play areas (Block D1/D2 c. 815 sq. m & Blocks E1/E2 c.992 sq.m.); amenity terraces at 8th storey level on Blocks D1/D2 (totalling c. 900 sq.m.); amenity terraces at 8th storey level on Blocks E1/E2/E2A (totalling c. 1,798 sq.m); -2 no ESB sub stations located at the ground floor level of blocks D1/D2 (totally c.48 sq.m) and 4 no. ESB sub stations located at the ground floor level of blocks E1/E2/E2A (totalling c. 42 sq. m); -3 no. LV switch rooms located at ground floor level of Blocks D1/D2 (c. 66 sq.m) and 4 no. LV switch rooms at ground floor level of blocks E1/E2/E2A (totalling c. 57 sq.m); -Communal commercial bin stores located at ground floor of Block D2 (c. 40 sq. m) and at ground floor level of Block E2 (c. 30 sq.m); -Bin store and health waste bin store located at ground floor of Block D1 associated with the proposed health centre; -Ancillary storage spaces located at round floor of blocks D2, E2; -Provision of public realm spaces including a portion of Glass Bottle Square, streets and public amenity spaces; -One new local /side street (Market Street) connecting to the permitted Central Boulevard; -The provision of the South Bank Link Road as identified in the SDZ Planning Scheme. Note that the proposed South Bank Link Road will include temporary bollards and fencing to restrict access until such time that a future connection/tie into South Bank Road is proposed and delivered. The proposed development will include hard and soft landscaping, pedestrian and cycle links, boundary treatments, tree planting, interim site hoarding, public lighting, green/blue roofs, commercial and residential waste & recycling facilities, piped site wide services and all ancillary works and services necessary to facilitate construction and operation. This application will be accompanied by an Environmental Impact Assessment Repot (EIAR) and a Natura Impact Statement (NIS). / 0.0 km away / 05 July 2024Granted
- PWSDZ3406/22Permission for development for a mixed use development (Referred to as Phase1B) on this site of 15.06 hectares including lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4, focused primarily, but not exclusively, on a net site area of 0.76 hectares (identified as within the A3 Lands) in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The overall site is bounded to the north-west by Sean Moore Road, to the north-east by South Bank Road, to the south-east by Dublin Port lands and Dublin Bay, and to the south-west by Sean Moore Park. The overall site subsumes the 4.3 hectares site of the infrastructure permission (Parent Permission) (Reg. Ref. PWSDZ3270/19) for which Dublin City Council issued a Notification of Final Decision (10-year permission) on 28 January 2020, permitting: streets, transportation, water services and utilities’ infrastructure; public realm and public amenity spaces; and temporary landscaping of a school site, to facilitate Phase 1 development as provided for under the approved Poolbeg West SDZ Planning Scheme. The overall site is also the subject of an application for planning permission (Phase 1 RFI Scheme) (PWSDZ3207/21) which relates to the development on a site area of some 4.46 hectares and proposes 570 No. apartments within a mixed-use development (53,032 sq m), as well as the Multi-Modal Transport Hub (232 sq m) and the Meanwhile Use ‘Cultural Hub’ (1,364 sq m). The Phase 1 RFI Scheme is located directly adjacent to the proposed Phase 1B development within the overall site. Access and servicing of the proposed Phase 1B development will be by way of the central boulevard and adjoining side street as included in the Phase 1 RFI Scheme application for planning permission (PWSDZ3207/21) which also seeks to amend the infrastructure permission (Parent Permission) (Reg. Ref. PWSDZ3270/19) amongst other things. The proposed Phase 1B development will consist of: amendment to Permission Register Reference PWSDZ3270/19 in those areas where the net site of 0.76 hectares overlaps with the boundaries of the earlier 4.3 hectare infrastructure permission (including amendments to the permitted vehicular and basement access point, materials, urban tree locations and landscaping, and changes in level for the permitted streets, village green and public realm and public amenity spaces); and the construction of a residential and mixed-use scheme comprising a floor area of 43,944 sq m (37,020 sq m above basement, together with a basement/undercroft area of 6,924 sq m, comprising 1 No. block (identified as Block L) to provide: 356 No. apartment units and associated residential amenity facilities; ground floor retail unit; together with associated infrastructural works on the overall site. The 356 No. apartment units will consist of: 264 No. apartment units; 55 No. affordable housing apartments; and 37 No. social housing apartments. (The social and affordable housing is provided in accordance with Objective H7 of the Planning Scheme.) The proposed Phase 1B development will consist of: • The building will range in height from 5 – 18 storeys over basement/undercroft to provide 356 No. apartment units (with balconies/terraces to be provided on all elevations at all levels for each residential block, consisting of: 89 No. 1-bedroom units (2no. studio 1-bedroom 1 person and 87 no. 1-bedroom 2 persons); 213 No. 2-bedroom units; and 54 No. 3-bedroom units (for the avoidance of doubt, Section 11.5.1 of the Planning Scheme clarifies the description of ‘height’ in Figure 11.3 to be taken from the constructed ground floor level; references to ‘basement’ and ‘undercroft’, respectively, are interchangeable given the changes in level across the site); • The provision of 844 sq m of residential amenity facilities (to include a lounge, meeting area, and other private amenities); • Retail space located at the ground floor (310 sq m); • A total of 69 No. car parking spaces (incl. 6 No. car share spaces) located at basement level with vehicular access from the street level along the north-western elevation and the new adjacent side street, and the provision of 11 No. on-street car parking spaces (incl. 2 No. EV on-street car parking spaces)) (Note the 11 No. on-street car parking spaces is inclusive of 2 No. on-street car parking spaces proposed as part of the Phase 1 Residential application for planning permission (PWSDZ3207/21)); • Provision of 610 No. bicycle parking spaces (550 No. long-stay standard bicycle parking spaces located at basement level); 38 No. short-stay standard bicycle parking spaces located at surface level; 17 No. cargo bicycle parking spaces located at basement level; and 5 No. cargo bicycle parking spaces located at surface level); • plant rooms and resident storage spaces located at basement level; • Landscaped open spaces to comprise c.2441 sq m of residential communal courtyards (incl. children’s play areas), and roof terraces (6th, 8th, 10th & 17th Floors); and • 1 No. ESB double substation and associated LV switch rooms located at ground floor along the south elevation. The proposed development will also include hard and soft landscaping, pedestrian and cycle links, boundary treatments, tree planting, interim site hoarding, public lighting, green roofs, commercial and residential waste facilities, piped site wide services and all ancillary works and services necessary to facilitate construction and operation. This application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS). / 0.0 km away / 08 February 2023Granted
- WEBPWSDZ2249/24Modifications to a permitted mixed-use development (referred to as 'Phase1B') located at this site of c.0.76 ha. which is identified as being within the 'A3' lands in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The wider site also includes the lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4. The modifications relate to Block L of the development permitted under Dublin City Council Planning Reference PWSDZ3406/22 (and amended through Planning Ref. PWSDZ4341/23, and PWSDZ3945/24). The proposed modifications consist of the change of use of permitted Ground Floor Level internal amenity space, bike store, circulation space, and an apartment unit (2-bed) (Unit No. L-00-004) to creche space/facility (c. 277 sq m). The proposed development will result in an overall apartment unit reduction of 1 No. apartment. The proposed development also includes: change of use at Basement Level from maintenance store. to residential amenity (spin studio); provision of outdoor crèche play space within the Ground Floor Level courtyard; provision of 'drop off' car and bike spaces along 'Furnace Walk'; relocation of all secure cargo bike parking from Ground Floor Level to Basement Level; and all other associated works. / 0.0 km away / 27 November 2024Granted