WEB1282/25: RETENTION PERMISSION: Existing completed single storey portable storage units comprising storage accommodation (54.5M2 approx gross internal area) for use ancillary to the existing pitch and putt course with overall site area 7815m2 (0.78ha) approx, & associated site works including external pathway, works subject to Dublin City Council Enforcement Section 152 Warning Notice of 04.07.2024 of the Planning and Development Act 2000 (as amended)
Rear 80 Philipsburgh Avenue, Dublin 3, D03H3F1
DecisionGrant retention permission
Decided08 December 2025
Application typeRetention Permission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- WEB1389/25RETENTION:The development will consist of: Retention of the existing temporary telecommunications structure, for a defined period of 24 months, consisting of a 15m transportable monopole structure secured by 4 anchor bolts to 4 No. 2m x 2m x 1m removable concrete ballast blocks; & all associated antennas, dishes and ancillary ground-based equipment cabinets. Situated within the construction site hoarding on a section of land at 80 - 82 Philipsburgh Avenue, Fairview, Dublin 3, D03H3F1. / 0.0 km away / 17 April 2025Granted
- WEB1222/25A proposed one & two-storey extension to rere, incorporating alterations to 2 no first floor rere windows / 0.1 km away / 02 April 2025Granted
- 5176/22PERMISSION: The development proposes the demolition of the existing 2 storey building on site (approx. 1020.5 sq.m GFA), amendments to the quantum of existing car parking, removal of existing substation on Philipsburgh Avenue, and the construction of 48 no. new residential apartment units ( 48 no. 1 bed units) in 2 no. apartment building, consisting of 1 no. 2-4 storey building (Building A fronting Philipsburgh Avenue) and 1 no. 2-4 storey (Building B rear block). Building A provides 22 no. 1 bed apartment units and Building B provides 26 no. 1 bed apartment units. All units are intended to provide housing for independent living for older residents (60 years plus). An office room (7.2 sq.m), communal room (34.2 sq.m) and Kitchenette/WC (10.5 sq.m) associated with the apartment units will be provided. The development also proposes approx. 372.8 sq.m of communal open space, balconies/ terraces associated with individual apartment units, associated secure bicycle parking, car parking (4 no of spaces) and bin storage, ESB Substation, hard and soft landscaping and all other associated site works and services above and below ground on an overall site area of approx 2681 sq.m Access to the development will be via the existing access point along Philipsburg Avenue, which will be upgraded to provide enhanced pedestrian/vehicular access. Access to adjacent pitch and putt club lands is maintained via the provision of vehicular/pedestrian gates in the south east corner of the site. A Natura Impact Statement has been prepared and submitted with this Planning Application. / 0.1 km away / 06 April 2023Granted
- WEB1387/25The proposed development will consist of the installation of 18 no. telecommunication antennas, together with 6 no. dishes, 3 no. equipment cabinets and all associated equipment enclosed behind 2no. profiled reinforced, perforated plant screens. the development will provide high speed wireless data and broadband services for all 3 of Irelands mobile operators, namely Eircom (t/a eir), Three Ireland and Vodafone Ireland. The Planning Authority should please note that this is not an amendment application to the original permitted independent living application submitted to Dublin City Council application dated 06.04.2023 reference 5176/22 and subsequent An Bord Pleanála grant dated 02.01.2024 reference ABP-316593-23, which is now under construction. This is a wholly separate and independent application for new telecommunication infrastructure. / 0.1 km away / 19 August 2025Granted
- WEB1158/25The construction of a new extension and new bay window to the rear of main house, a new porch to the front and side of main house, a first floor window on north gable, external insulation on existing house, new north boundary at front and all associated ancillary works including demolition as necessary to facilitate new construction. / 0.1 km away / 25 July 2025Granted
- WEB1876/22Demolition of two-storey extension to side and single-storey extensions front to rear, and replacement with single/two-storey two bedroom end of terrace house with existing vehicular access widened and a new vehicular access for existing dwelling. / 0.1 km away / 13 December 2022Granted
- WEB1277/22The development will consist of the partial demolition of the return of the existing two-storey end-of-terrace house and the construction of a two-storey extension; a new window on the gable at first floor level, the relocation of the side gate, increasing the height and rendering of the side garden wall and associated hard and soft landscaping and ancillary works. / 0.1 km away / 20 May 2022Granted
- 3976/20Permission for reconstruction of existing attic storeroom with installation of new staircase and dormer window to rear and for 2 no. velux rooflights, one to front and one to rear, with all associated site and drainage works. / 0.1 km away / 19 February 2021Granted