WEB1411/19: The development will consist of the installation of a 3-bay, 4.350m long x 2.160m wide x 2.870m high stainless steel and glass bespoke bus shelter with 1 no. 86 inch double sided digital advertising display including all associated site works and services.
Bus Stop No. 270, on the public footpath in front of No. 9-11, O'Connell Street Upper, Dublin 1 (eastern side of the street)
DecisionGrant permission
Decided25 October 2019
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bus Stop No. 270, on the public footpath in front of No. 9-11, O'Connell Street Upper, Dublin 1 (eastern side of the street)?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- WEB1410/19The development will consist of the installation of a 3-bay, 4.350m long x 2.160m wide x 2.870m high stainless steel and glass bespoke bus shelter with 1 no. 86 inch double sided digital advertising display including all associated site works and services. / 0.0 km away / 05 September 2019Granted
- 5030/23RETENTION: the development consists of the retention of an existing external awning over the front entrance of the unit located on the ground floor, the retention of the external outdoor seating which include 4 no. tables and 10 no. chairs and the retention of circa 1.8m surrounds bounding the external outdoor seating. / 0.0 km away / 22 February 2024Granted
- WEB1154/25PROTECTED STRUCTURE The development will consist of upgrade works to replace existing exterior signage with new signage with updated colours and logo. / 0.0 km away / 21 March 2025Granted
- 4687/23The development will consist of a change of use of No.12 Cathedral Street from existing office use over ground and mezzanine floor levels to restaurant with ancillary retail use and the insertion of a new link opening in the party wall between No. 12 Cathedral Street and the existing restaurant at No’s 13 and 14 Cathedral Street at ground and mezzanine levels. It is also proposed to omit the existing entrance at No. 13 Cathedral Street and make good the existing shopfront. New signage consisting of single raised backlift lettering is proposed to No. 12 Cathedral Street. / 0.1 km away / 13 December 2023Granted
- WEB2227/24PERMISSION AND RETENTION is being sought by Shining Star Capital Ltd for development at No. 8 Cathedral Street, Dublin 1 D01 V0C6. The development will consist of/consists of; 1. Retention of modifications to the existing shopfront and signage. 2. Retention of roof mounted ventilation extract ducting. 3. Permission to extend the ventilation extract ducting vertically. The extended ducting will be supported from the gable wall of No. 9 Cathedral Street. / 0.1 km away / 19 November 2024Granted
- 2085/20The development will consist of the following: (a) change of use of existing basement storage to cultural and artistic use; (b) change of use of existing vacant ground floor shop/store to retail unit & coffee shop; (c) change of use of existing vacant first & second floor offices to a 5 bedroom apartment; (d) elevation alterations to include a new shopfront with signage & 2 no. new windows at second floor level to the west & south facing elevations. / 0.1 km away / 14 May 2020Granted
- 5432/22PROTECTED STRUCTURE: Permission at a site (c.0.02Ha), at No. 61 O'Connell Street Upper (a Protected Structure), including rear onto Henry Place, Dublin 1. The site is otherwise bound by No. 62 O'Connell Street Upper to the south, the east side of Henry Place to the west, the west side of O'Connell Street Upper to the east and No. 60 O'Connell Street Upper to the north. The proposed development comprises the conservation, repair, refurbishment and adaptive reuse of an existing commercial building (4 storey over basement) to include: - a 'licensed restaurant/cafe unit with takeaway/collection facility' (c.35 sq. m gfa) at ground floor level on O'Connell Street Upper and a 'licensed restaurant/ cafe unit with takeaway/collection facility' (c.10 sq. m gfa) at ground floor level on Henry Place; 3 no. 2 bed apartments from 1st to 3rd floor (1no. unit per storey); 1no. gym/leisure studio (c.172 sq. m gfa) at basement level; All associated and ancillary site development works, conservation, demolition, landscaping, temporary works, including: - the creation of a new pedestrian link through part of the ground floor connecting O'Connell Street Upper and Henry Place; bicycle (8no.) and bin storage to rear of No. 61 O'Connell Street Upper at ground floor level; building signage zones and retractable canopy. The application site is within the O'Connell Street Architectural Conservation Area. An Environmental Impact Assessment Report (EIAR) accompanies this application. / 0.1 km away / 27 September 2023Granted
- WEB1523/25PROTECTED STRUCTURE: McDonald's Restaurants of Ireland Ltd. intend to apply for planning permission for development at No. 62 O'Connell Street Upper, Dublin 1 (Protected Structure). The development will consist of proposed external and internal improvement works including improved service window and counter area, new walls and fire doors at ground floor level; new walls and fire doors to basement, upper mezzanine, first floor, second floor and third floor levels; proposed works to the existing shopfront/front eastern elevation to include new fascia board and associated works, replacement of existing lights, replacement glazing to existing window, new shopfront signage to replace existing signage to include internally illuminated projecting sign, wall mounted golden arch and 'McDonald's' text signage, new orb, and all associated site works necessary to facilitate the development. / 0.1 km away / 07 May 2025Granted