WEB1586/19: 2-storey extension to side and a single storey extension to rear, internal modifications and all related works
53, Bargy Road, Dublin 3
DecisionGrant permission
Decided27 November 2019
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 4407/19The development will consist of the construction of a two storey extension to the rear with velux roof lights, internal refurbishment to existing dwelling, single storey porch extension to the front and all associated site works. / 0.0 km away / 09 January 2020Granted
- 5435/22Permission for development will consist of modifications to the ground floor layout and shop façade and will include for: a) Single-storey extension to front of the existing store to provide a DRS facility to allow customers to return plastic beverage bottles to a reverse vending machine in store. b) The removal of the existing entrance/exit pod. c) The removal of the existing trolley bay. d) Proposed free-standing trolley bay. e) Proposed alteration works to store elevation. f) Alteration works to car park area. g) All ancillary works required to complete to the required Building Regulations standards. / 0.1 km away / 21 August 2023Granted
- 4202/22Planning permission to erect 482.00m2 or 99.90 kWp of photovoltaic panels on the roof of our existing Lidl Store at East Wall with all associates site works at Lidl Ireland GMBH. / 0.1 km away / 28 October 2022Granted
- WEB1344/24The retention of the existing scrolling internally illuminated double sided 'Metropole' advertising display case mounted on an offset leg. / 0.1 km away / 16 May 2024Granted
- WEB2990/25RETENTION: The development consists of a change of use from workshop to a GYM with reception area, the erection of new signage to the front of building and all other ancillary site development works / 0.1 km away / 17 April 2026Granted
- 2766/21The development will consist of the continued use of a temporary surface car park to provide ancillary parking for ESB staff temporally located at the gateway building, East Wall Road, during the redevelopment of the ESB Networks headquarters offices for a period up to a maximum of five years. The works include minor alterations to the existing internal car park layout reducing overall car parking capacity from 250 to 150 spaces. Permission is also sought to retain all entrances, security gates, security hut, lighting, boundary treatments and all ancillary site works without modification. / 0.1 km away / 08 July 2021Granted
- WEB2474/24Single-storey front extension with pitched roof. New pitched roof over existing side extension. Side window on extension to be changed to a door. New vehicular access with dropped kerb. / 0.1 km away / 10 January 2025Granted
- WEB2611/25CHANGE OF USE from a Gym to a Place of Worship. / 0.1 km away / 01 October 2025Granted