WEB1596/23: RETENTION: The retention of the existing scrolling internally illuminated, double sided 'Metropanel' advertising display unit.
On the public footpath on the Western side of Mercer Street Upper, at the Southern side of the junction with Digges Street Upper, Dublin 2
DecisionGrant retention permissio
Decided14 September 2023
Application typeRetention Permission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near On the public footpath on the Western side of Mercer Street Upper, at the Southern side of the junction with Digges Street Upper, Dublin 2?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 2082/20PROTECTED STRUCTURE & RETENTION: Retention permission for the following works at No. 43 Aungier Street, Dublin 2 (a Protected Structure) and No. 1 Digges Street Upper, Dublin 2: a) No. 1 Digges Street Upper: Reinstatement of two no. windows at first and second floors to the north elevation; the removal of a roof to a single storey annex at the north-east corner, with guarding to the surrounding flat roof, to provide an open air smoking area; the relocation of the disabled w.c. within the ground plan; the removal of internal brick wall at first floor and ground floor level and b) 43 Aungier Street and No. 1 Digges St. Upper: other minor alterations as reflected on the revised as-built drawings. / 0.1 km away / 02 October 2020Granted
- 3792/20Retention Planning permission for the development consists of the retention of 1 no. temporary marquee (24m x 9.1m) to support the ongoing edcational use of the Royal College of Surgeons Ireland. Retention permission is sought for a period of 3 years. / 0.1 km away / 27 January 2021Granted
- 2473/19Planning permission for the replacement of a 6.4m x 6.4m conventional advertising poster (including 150mm wide frame all round) and with overhead lights, with a 6.5m x 6.5m digital advertising display unit (with 200mm wide frame all round) without overhead lights, both having an overall height of 10.95m off the ground, on the side (north) elevation of No. 2 Wexford Street, Dublin 2, on the corner with Cuffe Street, Dublin 2. / 0.1 km away / 14 August 2019Granted
- 2035/19RETENTION: Retention planning permission is sought for the division of existing ground-floor retail unit into 2 no. retail units with new entrance door. / 0.1 km away / 05 March 2019Granted
- 2016/19Permission for the development of an education and research building on a site of c. 0.3945 hectares comprising Block A Ardilaun Centre (also known as Nos. 112-114), St. Stephen's Green, Dublin 2, D02 AF59, No. 4, Proud's Lane, Dublin 2, D02 WY28, part of No. 26 York Street, Dublin 2, D02 P796 and part of the courtyard of the Ardilaun Centre, Dublin 2. The development will consist of the demolition of Block A Ardilaun Centre (vacant office of varying heights from five to eight storeys over basement/lower ground floor) (7,904 sqm), No. 4 Proud's Lane (office) (three storeys) (265 sqm), an ESB substation and security hut to the rear of No. 26 York Street at Cuffe Lane (12 sqm and 11 sqm, respectively) and the podium and basement car park and associated ramp access vis Cuffe Lane serving No. 26 York Street and Ardilaun Centre (1,135 sqm), and the construction of a Third-Level Education building including research (laboratories), teaching, faculty, administration, staff and student services (including catering, recreation and welfare facilities), ancillary teaching and learning spaces, public engagement space and associated ancillary spaces, building infrastructure and support. The development will consist of the construction of a building of varying heights from five to eight storeys (including setbacks) (with roof top plant) of 10,339 sqm gross floor area (including roof top plant of 74 sqm) over lower ground floor (1,420 sqm) and basement (1,585 sqm) levels. The development will also include the provision of: a ground floor level entrance lobby to No. 26 York Street to its south elevation (12 sqm); a second floor level link connecting the new building to second floor level of No. 26 York Street; and an ESB substation and security hut to the rear of No. 26 York Street at Cuffe Lane (11 sqm and 9 sqm respectively). The development includes a cantilever at third and fourth floor levels to the east elevation, and terraces to the north elevation at third floor level, to the south elevation at third, fourth and fifth floor levels, and the east elevation at fifth floor level. The development will include: the reconfiguration of the existing vehicular ramp; the relocation of existing bicycle parking spaces (100 no.) for No. 26 York Street to lower ground floor level and the provision of an additional 96 No. bicycle parking spaces at this location; related elevational works; vehicular and bicycle access via Cuffe Lane and pedestrian access via St. Stephen's Green, Proud's lane and Cuffe Lane; changes in level; boundary treatments (and revisions to existing boundaries, where applicable) and access gates; balconies and terraces; associated lighting; the relocation of a 450mm combined public sewer from underneath the Ardilaun Centre car park and associated ramp to the proposed landscaped courtyard; associated site servicing (foul and surface water drainage and water supply) and related pipework and tanks; the provision of SUDs measures, including attenuation tanks and green roofs; disabled car parking; solar panels; waste management areas; all hard and soft landscaping (including tree and planting removal); boundary treatments; changes in level; and all other associated site excavation and site development works above and below ground. / 0.1 km away / 27 August 2019Granted
- 2142/20The development consists of the following: (i) Demolition of existing structures on site. (ii) Construction of an 8 storey office development over a lower ground floor/basement level. A part mezzanine if provided between the upper ground floor and first floor. (iii) The proposal steps down in height at various levels with accessible terraces, to part 4 storey to Protestant Row. (iv) A total 48 bicycle parking spaces are proposed at upper ground/street access level with access off Protestant Row. (v) The proposal includes plant room at roof level. (vi) A shared office/town hall/cafe space is proposed at upper ground level. (vii) Public realm upgrades to Montague Court. (viii) The overall proposal comprises c. 4,717sq.m Gross Floor Area. (ix) All associated site development and services works, landscape works, plant, substation and associated development. / 0.1 km away / 22 June 2020Granted
- WEB1128/25PERMISSION AND RETENTION KC Capital Property Group Limited intend to apply for planning permission and retention permission for development at The Greenside Building, 45-47 Cuffe Street, Dublin 2 (D02 CX48). The application site also fronts Montague Court and Protestant Row. This application seeks amendments to the development permitted and under construction under Reg. Ref. 2142/20, as amended by Reg. Ref. 3507/20 (ABP-308961-20). Planning permission is sought for the following proposed amendments: - Reconfiguration of the internal layout at the lower and upper ground floors, and mezzanine level, along with associated changes to the southern elevation (Protestant Row); - Omission of the lightwells from the previously permitted layout at the upper ground floor level; - The amendments result in an increase of 11.6 sqm gross floor area to the permitted scheme of 5,210.9 sqm, bringing the overall gross floor area to 5,222.5 sqm; Retention permission is sought for the following: - Change in material at 6th floor, western elevation (Wexford Street) from permitted aluminium panelling to glazed curtain wall. / 0.1 km away / 17 April 2025Granted
- 4482/23Amendments to the development permitted and under construction under Reg. Ref. 2142/20, as amended by Reg. Ref. 3507/20 (ABP-308961-20). Permission sought for amendments to the development permitted and under construction under Reg. Ref. 2142/20, as amended by Reg. Ref. 3507/20 (ABP-308961-20). The proposed amendments consist of the following: (i) Provision of a fire escape corridor, with new fire exit on to Cuffe Street, and associated alterations to the lightwells at street level; (ii) Associated revisions to internal layout at basement and upper ground floor level and eastern elevation; (iii) Reduction in height of permitted revolving door on the northern elevation; (iv) Relocation of permitted door and provision of roller shutter door on the southern elevation; (v) The amendments result in a reduction in gross floor area to the permitted scheme of 5,210.9 sq.m. with an overall proposed GA of 5,189.3 sq.m. / 0.1 km away / 08 November 2023Granted