WEB1607/24: (1) The construction of a single story ground floor extension to front elevation (east) some 6 Sq.m (2) all associated site works.
6, Hazelcroft Terrace, Finglas, Dublin 11
DecisionGrant permission
Decided11 July 2024
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 6, Hazelcroft Terrace, Finglas, Dublin 11?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3404/22Planning permission for development at Unit 2 Clearwater Retail Park, Finglas, Dublin 11. The development is further to a previously permitted planning permission (Reg. Ref. 2637/16) and will consist of: (a) the change of use of Unit 2 from retail to cultural / recreational use comprising a 24 hour 7 day a week gymnasium (total area = 2210 sqm); (b) the erection of a mezzanine floor and extension to the rear of the unit to provide for an overall gymnasium facility of 1173 sqm at ground floor (948 sqm existing + 225 sqm extension) and 1037 sqm at mezzanine level; (c) the erection of new illuminated signage to the front and rear elevations; (d) the installation of a new front entrance door; (e) relocation of fire escape exists; (f) the provision of 44 no. additional secure cycle parking spaces; (g) all associated site development works. / 0.1 km away / 25 April 2022Granted
- WEB1229/25RETENTION: Retention permission for development comprising the erection of 1 no. single storey detached habitable room (approx 37.7m2 gross internal area) including associated site works in rear garden (overall site of approx 375m2/0.037ha). / 0.1 km away / 03 April 2025Granted
- 3570/21PERMISSION AND RETENTION PERMISSION: For development at this c. 0.012 ha site, in the car park of Tesco, Clearwater Shopping Centre, Finglas Road, Dublin 11. The development will consist of/consists of: (i) retention permission for "Click and Collect" signage in the existing Tesco car park; and (ii) permission for the construction of a sheltered canopy (c. 50 sq.m) in the existing car park for the purpose of providing 2 no. dedicated "Click and Collect" spaces for the existing Tesco store, a pedestrian crossing and all associated site development works. / 0.1 km away / 18 November 2021Granted
- 4953/23Provision of a drive-thru lane for the Costa Coffee unit, including a canopy and service hatch on the eastern side of the unit, a height restrictor/entrance barrier on the access lane, 3.5m wide drive-thru lane, and associated hard and soft landscaping, resulting in the removal of 23 no. existing car parking spaces; Internal alterations to the layout of the existing Costa Coffee unit; Provision of associated signage consisting of 2 no. directional signs, 1 no. order station, and 3 no. menu boards/advertisement signs; Alterations to the south, east and north elevations of the Costa Coffee unit, including the provision of new signage; An increase of unit floor area of 8 sq.; Associated alterations to the existing car parking, landscaping and all associated development. / 0.1 km away / 22 July 2024Granted
- 2693/19The proposed development will consist of the construction of an extension to the northern/side facade of this five-storey over basement nursing home facility (granted under Reg. Ref. 3065/14) as follows: construction of a four-storey extension to provide an additional 64 bedrooms and associated ancillary facilities and office/administration areas; landscaping boundary treatments including new retaining wall; 30 no. bicycle spaces to the rear of the building; utilisation of existing car parking; and all associated site and engineering works necessary to facilitate the development. / 0.2 km away / 18 September 2019Granted
- 4431/19RETENTION: The development consists of works to the five-storey over basement 83 bedroom nursing home (granted under Ref. 3065/14) as follows: internal reconfiguration/modifications to bedrooms, associated ancillary/common facilities and office/administration areas resulting in an 80 bedroom facility; minor external alterations to all elevations; reconfiguration/modifications to basement including a laundry resulting in 30 car parking spaces now at basement level, minor extension of the basement (northern side) to provide an equipment store and lift down to basement level; and all associated site works necessary to facilitate the development. / 0.2 km away / 22 June 2020Granted
- 2122/21RETENTION: Permission of an external signage erected on the southern façade of the existing nursing home. The signage measures 2.6 x 2.9m and consists of the Carechoice Company logo on a white metal panel with associated strip down lighting, fixed to external terracotta cladding. / 0.2 km away / 25 March 2021Granted
- 2614/20Planning Permission to install 6 no. antenna and 2 no. transmission dishes on existing supporting poles together with equipment cabinets, cabling and associated site works at the roof level of Carechoice Ardmore, Finglas Road, Finglas South, Dublin D11 X4YP. / 0.2 km away / 15 July 2020Granted