WEB1833/20: The construction of a first floor extension over existing single storey extension to the rear and two new windows at first floor level in the South-West facing elevation wall.
36, Dunmanus Road, Cabra West, Dublin 7
DecisionGrant permission
Decided19 January 2021
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- WEB1578/21New 2 storey extension to rear with internal modifications and associated site works / 0.0 km away / 14 July 2021Granted
- WEB1009/19A new part 2 storey, part single storey extension to Rear of dwelling, Conversion of attic space to office area with dormer type window to rear with internal modifications, and associated site works. / 0.1 km away / 11 March 2019Granted
- 4797/19Permission to erect a 5.2m x 1.85m x 2.8m high stainless steel and glass bus shelter with 2 no. internally illuminated advertising panels each of 2 sq. metre area. / 0.1 km away / 21 February 2020Granted
- WEB1563/22Single-storey porch to front and vehicular access driveway, walls, piers, gates and ancillary site works to front / 0.1 km away / 08 August 2022Granted
- WEB1996/20Installing a new window opening at first floor level to front elevation. / 0.1 km away / 25 February 2021Granted
- WEB2447/24Planning permission for development at a c. 0.16 ha site located at Nos. 62-66 Faussagh Avenue, Dublin 7, D07 KH60, (formerly ‘The Cabra House’) and the adjoining unnamed laneway to the rear and to the west, extending to Faussagh Avenue. The development will principally consist of: the demolition of the part-one, part-two storey detached former licenced public house (950 sq m); the construction of a four-storey building (total gross floor area of 2,082sq m); (comprising a licensed supermarket of 475 sq m at Ground Floor; with 18 No. apartments (13 No. 1-bed units and 5 No. 2-bed units, with balconies or terraces on the north and south elevations). The development will also consist of: private communal open landscaped space at First Floor Level podium over the extended ground floor retail area (320 sq m); circulation spaces; ESB substation and switch room; plant room; waste storage areas; bicycle, cargo bike and motorbike parking; 6 No. resident car parking spaces at the rear accessed via the laneway; sustainable urban drainage systems (including attenuation tank and green roof); boundary treatments, including the provision of a replacement rear gate; associated hard and soft landscaping; all other associated site excavation; infrastructural and site development works above and below ground including changes in level, and associated site servicing (foul and surface water drainage and water supply). The development will also consist of: alterations to the layout of the unnamed laneway to the rear and west including the removal of the existing gate at the entrance; revision to surface layout and road markings. Access to the scheme will be via Faussagh Avenue and the unnamed laneway to the rear. / 0.1 km away / 08 August 2025Granted
- 3090/24The development will consist of removal of existing storage shed to rear/side and proposed construction of single storey extension to rear/side. / 0.2 km away / 15 March 2024Granted
- WEB1372/23(1) Demolition of existing shed circa 11sqm, (2) construction of two storey extension to side and rear of existing dwelling (3) with single-storey extension to rear, (4) conversion of attic with Dormer to rear, (5) widening of existing vehicular access and all associated site works. / 0.2 km away / 28 June 2023Granted