GrantedDecided 08 July 2025Dublin City Council

WEB2069/25: We, Google Ireland (Limited), intend to apply for planning permission for development at Gasworks House, Block E1 and E2, Barrow Street, Dublin 4. The development will consist of: - Removal of existing building signage and provision of new signage extending to a total area of 5.5 sqm, comprising individually mounted internally illuminated letters fixed to a prefabricated powder-coated aluminium frame, located on western elevation of the building at ground floor level fronting Barrow Street above entrance doors. - Replacement of entrance doors at western elevation at ground floor level to match existing. - Replacement of the existing revolving door entrance with a new 2.8m high glazed curtain wall at the western elevation to Barrow Street at ground floor level. - Minor reconfiguration of ground floor layout. There is no change proposed to total gross floor area of the building.

Gasworks House, Block E1 and E2, Barrow Street, Dublin 4
DecisionGrant permission
Decided08 July 2025
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Gasworks House, Block E1 and E2, Barrow Street, Dublin 4?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →