GrantedDecided 11 June 2025Dublin City Council

796-798 Howth Road, Raheny, Dublin 5

Planning application WEB2580/24
DecisionGrant permission
Decided11 June 2025
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Dublin City Council.
The development will consist of the demolition of the 2-no. existing two-storey houses (of c.234.4sqm and c. 172.5 sqm) and associated outbuildings, and the construction of a new residential development in 3 no. new build blocks, Block A, Block B, and Block C ranging between 3 and 4 storeys in height. The development consists of 30 no. residential units (13 no. 1 bed units, 8 no. 2 bed units, and 9 no. 3 bed units) and associated residential amenity space. The overall development proposal provides for the following: -Block A (c. 1395.4 sqm GFA) - 3 to 4 storeys and shall consist of 15 no. units (7 no. 1 bed units, 3 no. 2 bed units, and 5 no. 3 bed units) with all associated gardens, balconies, terraces, storage space and access cores. Block B (c. 540.2 sqm GFA)- 3 storeys and shall consist of 6 no. apartment units (3 no. 1 bed units, 1 no. 2 bed unit and 2 no. 3-bed units) with all associated gardens, terraces, storage space and access core. Block C (c. 791.5 sqm GFA) - 3 storeys and shall consist of 9 no. units (3 no. 1 bed units, 4 no. 2 bed units, and 2 no. 3 bed units) with all associated gardens, balconies, terraces, storage space and access cores. Each residential unit has an associated area of private open space in the form of balconies, terraces and gardens. The development shall also provide for the provision of vehicular and pedestrian access off Howth Road; 18 no. car parking spaces at surface level (10. of these as EV designated spaces), 2 no. motorcycle parking spaces, 72 no. bicycle parking spaces (56 no. resident spaces, 15 no. visitor spaces, 1 no. cargo bike space), and refuse and recycling storage facilities, including a bike/bin store of c.8.9sqm GFA. The site development and infrastructural works provide for water, foul and surface water drainage and all associated connections; all ESB connections/infrastructure and site service connections; all landscaping and public lighting; all boundary treatment works; internal walkways and hard landscaping; and all associated site clearance, demolition, and development works. A Natura Impact Statement has been prepared in respect of the planning application.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.
ACP-322927-25Submitted 03 July 2025 / decided 18 July 2025
Status not recordedAPPEAL WITHDRAWN
  1. Appeal submittedAppeal reference ACP-322927-25
    03 July 2025
  2. Appeal decisionAPPEAL WITHDRAWN
    18 July 2025
No appeal document has been bound to this case yet; the timeline will enrich as indexing continues.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City is in progress.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near 796-798 Howth Road, Raheny, Dublin 5?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →