GrantedDecided 31 July 2025Dublin City Council

WEB2689/24: PROTECTED STRUCTURE The proposed development comprises a 4-storey over basement maternity hospital building extension (Critical Care Wing, c. 9,946 sq m gross floor area) including: 80no. additional hospital bedrooms, new theatre and ancillary facilities, a new link corridor (Level 02) and connections with the existing Entrance Building and Main Hospital Building (protected structure); and, all ancillary demolition, site development, conservation, and landscaping and boundary works on campus, including: -•Associated refurbishment works within the existing Entrance Building. •Refurbishment of the existing ward space on Level 02 within the Plunkett Cairns Wing, Medical Residence Building and Main Hospital Building (Protected Structures). •Plant at basement of the proposed new Critical Care Wing. •Chimney flues, plant and associated screening at roof level of the proposed new Critical Care Wing and at roof level of the existing Entrance Building. •Demolition of - existing single-storey Outpatient department (c.1,174 sq m GFA), vehicular ramps and tunnel; - existing plant structures, including single-storey plant/waste store, low voltage switch room and defunct water tank, in the central garden area. •Construction of a new single-storey bicycle store to provide an additional 98no. bicycle spaces at surface level. •Replacement of the existing vehicular access ramps with two new realigned vehicular access ramps to the existing lower-level surface car parks. •Reconfiguration of the existing lower-level surface car parks, including removal of 67no. existing car parking spaces. •Relocation of the existing waste compactors, from north of the original hospital building (protected structure), to new location in the reconfigured lower-level surface car park area with associated landscape screening. •Relocation of the existing medical waste store to an external storage area, under the proposed new access ramp with associated removal of an existing caged clinical waste store. •Construction of a screened generator and medical gases compound within the northern portion of the site. •Hard & soft landscaping elements to the perimeter of the proposed building and carparks including the creation of a lightwell behind the existing boundary railings. •Minor reconfiguration, removal (c.10m) and making good of the protected boundary railings along the western perimeter of the site.•Replacement of the existing pedestrian and vehicular entrance gates at the northwest perimeter of the site.

Rotunda Hospital Campus, Parnell Square, Dublin 1
DecisionGrant permission
Decided31 July 2025
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.