GrantedDecided 05 June 2026Dublin City Council

CitiGroup Building, 1 North Wall Quay, Dublin 1, D01T8Y1

Planning application WEB6103/25
DecisionGrant permission
Decided05 June 2026
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Dublin City Council.
We, NWQ Devco Limited, intend to apply for a 10 year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. The site area is c. 0.88 ha. The proposed development will consist of: - Partial demolition, removal of existing facades and extension of existing 5-6 storeys office building; - The resulting proposed extended office development ranges in height from 7 no. to 12 no. storeys in height over existing basement comprising office accommodation and a community space; - The development comprises 4 no. blocks ranging in heights of 7-11 no. storeys (Block A), 12 no. storeys (Block B), 10 no. storeys (Block C) and 7 storeys (Block D) which represents a maximum height increase of 6 storeys above the existing building; - The overall gross floor area of the development comprises 61,882 sq.m. (including basement level) including 53,774 sq.m. of office space (39,151 sq.m. of office net internal floor area)and 660 sq.m. of community space; - Office accommodation is proposed at ground floor to 11th floor level; - 1 no. internal community space is provided at ground floor level; - Outdoor terraces are provided at 4th, 5th, 6th 8th, 9th, and 11th floor levels; - Provision of a shared atrium between Block B and Block C; - Green roofs and blue roofs are provided across the scheme; - 32 no. car parking spaces will be provided at basement level to serve the development. This represents a reduction of 132 no. car parking spaces in comparison to the existing office building on the site; - 718 no. bicycle spaces and 4 no. motorcycle spaces are proposed at basement level; - 26 no. short-stay bicycle spaces (13 no. Sheffield stands) are proposed at surface level; - The development includes the fill and cover of existing access ramp to existing basement to provide a landscaped community pocket park (244 sqm) to the east of the building. The park will include a pedestrian link from North Wall Quay to Clarion Quay. - Provision of upgrades to existing public realm within application site including public footpaths along North Wall Quay, Commons Street and Clarion Quay; - All ancillary and associated works to facilitate the development including plant, pv panels, switch rooms, generators, water tanks, sprinkler plant, ESB substations, landscaping, telecommunications infrastructure and utilities connections and infrastructure. An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development and have been submitted with the planning application.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near CitiGroup Building, 1 North Wall Quay, Dublin 1, D01T8Y1?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →