ABP31172221/E: Permission for a strategic housing development consisting of the demolition of the existing building on site and the construction a ‘Build to Rent’ (BTR) apartment development. This will consist of 2 no. blocks ranging in height up to 15 storeys (over single level basement) along with a single storey kiosk building. The development will comprise 190 no. apartments (92 no. 1-beds, 86 no. 2-beds & 12 no. 3-beds). All residential units provided with private balconies/terraces to the north/south/east/west elevations. The BTR development will also include Resident Support Facilities & Resident Services & Amenities (total floor area c.594 sq.m) including concierge, management area, co working/meeting rooms, multipurpose rooms, relaxation/ sitting areas, parcel area, and resident’s pavilion and bicycle service station. Block 1 will also include a commercial office area, over two floors measuring c.518 sq.m. Block 2 will include a restaurant (c.232 sq.m) and a gym (c.163.5sq.m) accessible to the general public. A café kiosk of c.25 sq.m will be provided on the plaza. Provision of 59 no. car parking spaces in the basement and 474 no. cycle parking spaces at basement/surface level.. Vehicular/pedestrian/cyclist access from Ballymoss Road. A new public plaza will be provided fronting onto Blackthorn Avenue. Communal open space will also be provided at ground and roof levels. All associated site development works, landscaping, boundary treatments, plant areas, waste management areas, cycle parking areas, and services provision (including ESB substations). The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant Dun Laoghaire Rathdown County Development Plan 2016-2022. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: https://www.siemenssiteshd.ie
0.3772 ha former Siemens Site, Ballymoss Road And, Blackthorn Avenue, Sandyford Industrial Estate, Dublin 18.
DecisionGrant extension of duration of perm.
Decided28 November 2025
Application typeExtension Of Duration Of Permission
Source documents3
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- ABP31172221Permission for a strategic housing development consisting of the demolition of the existing building on site and the construction a ‘Build to Rent’ (BTR) apartment development. This will consist of 2 no. blocks ranging in height up to 15 storeys (over single level basement) along with a single storey kiosk building. The development will comprise 190 no. apartments (92 no. 1-beds, 86 no. 2-beds & 12 no. 3-beds). All residential units provided with private balconies/terraces to the north/south/east/west elevations. The BTR development will also include Resident Support Facilities & Resident Services & Amenities (total floor area c.594 sq.m) including concierge, management area, co working/meeting rooms, multipurpose rooms, relaxation/ sitting areas, parcel area, and resident’s pavilion and bicycle service station. Block 1 will also include a commercial office area, over two floors measuring c.518 sq.m. Block 2 will include a restaurant (c.232 sq.m) and a gym (c.163.5sq.m) accessible to the general public. A café kiosk of c.25 sq.m will be provided on the plaza. Provision of 59 no. car parking spaces in the basement and 474 no. cycle parking spaces at basement/surface level.. Vehicular/pedestrian/cyclist access from Ballymoss Road. A new public plaza will be provided fronting onto Blackthorn Avenue. Communal open space will also be provided at ground and roof levels. All associated site development works, landscaping, boundary treatments, plant areas, waste management areas, cycle parking areas, and services provision (including ESB substations). The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant Dun Laoghaire Rathdown County Development Plan 2016-2022. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: https://www.siemenssiteshd.ie / 0.0 km away / 31 March 2022Granted
- D06A/0893Demolition of all buildings on site / 0.0 km away / 16 October 2006Granted
- D25A/0788/WEB1) the demolition of an existing two-storey warehouse/office building on the site (approximately 1,016 sq. m. GFA); 2) the construction of an up to nine storey aparthotel (approximately 7,424 sq. m. GFA) consisting of 122 no. suites (73 no. one bedroom and 49 no. two bedroom) with reception area, administration and back of house facilities, ancillary public areas service, plant areas, waste management areas and storage areas at ground floor, provision of 16 no. surface car parking spaces (including 2 no. disabled spaces) and 54 no. cycle parking spaces; and 3) all other site development works required to facilitate the development including the formation of an additional vehicle access onto Ballymoss Road and set down area in front of the building, ESB substation and switchroom, installation of PV panels on the roof, hard and soft landscaping, landscaped roof terraces on fifth and eighth floor level and public realm upgrades to Ballymoss Road including additional tree planting and crossings over the existing footpath. / 0.0 km away / 17 April 2026Granted
- D18A/1210Permission for development. This is a new primary school opening in / 0.0 km away / 23 May 2019Granted
- D07A/0304A) construction of a temporary marketing and sales suite (which will be in place / 0.1 km away / 30 April 2007Granted
- D24A/0345/WEBPermission for the erection of new signage at Sandyford Central Café, Sandyford Central, Sandyford, Co. Dublin, D18WN5V / 0.1 km away / 05 July 2024Granted
- D16A/0377Permission for the installation of a 3m high 'lamp post' style relief vent / 0.1 km away / 14 July 2016Granted
- D08A/10751) Change of use of existing office building from Commercial office use into Edu / 0.1 km away / 26 January 2009Granted