D04A/0619: Change of use of part of existing residence to a sessional service
3, Glencairn Heath, The Gallops, Leopardstown, Dublin 18
DecisionGrant permission
Decided29 July 2004
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D19B/0074Permission for single storey extension at rear. / 0.0 km away / 09 April 2019Granted
- D16B/0363Permission for the construction of a single storey extension to the side and / 0.1 km away / 17 October 2016Granted
- D25A/0603/WEBThe development will consist of: the construction of a single storey extension / 0.1 km away / 12 September 2025Granted
- D21A/0783Permission for development. The developement will consist of / 0.1 km away / 07 February 2022Granted
- D19A/0994Permission for development. The development will consist of / 0.1 km away / 01 July 2020Granted
- D04B/0214Retention of single storey extension / 0.1 km away / 23 July 2004Granted
- D16A/0547Permission for development at a site of 1.18ha of the overall 1.85ha Lisieux / 0.1 km away / 27 January 2017Granted
- ABP30741520Permission for a development involves a total gross floor area (GFA) of 18,886 sq.m and comprises 200no. apartments (comprising 20no. studio units, 72no. 1 bed units, 100no. 2 bed units and 8no. 3 bed units) in 4 blocks including ancillary residential support facilities on the ground floor level of Block 1 and a creche on the ground floor of block 3 and a standalone ESB substation building. The proposed development includes the following accommodation on a block by block basis:- Block 1: 67no. apartments, ancillary accommodation and associated balconies in a 7 storey block (6 storeys with setback penthouse above) comprising 4no. studio units, 27no. 1 bed, 31no. 2 bed and 5no. 3 bed. This block includes a meeting/function rooms (112sq.m), gymnasium (220sq.m) and concierge office facilities (35sq.m) which are ancillary to the apartments; Block 2: 36no. apartments, ancillary accommodation and associated balconies in a 5 storey block (4 storeys with setback penthouse above) comprising 4no. studio, 9no. 1 bed and 23no. 2 bed; Block 3: 60no. apartments, ancillary accommodation and associated balconies in a 6 storey block (5 storeys with setback penthouse above) comprising 6no. studio, 27no. 1 bed, 24no. 2 bed and 3no. 3 bed. Block 3 includes the creche (356sqm) at ground floor; and Block 4: 37no. apartments, ancillary accommodation and associated balconies in a 5 storey block (4 storeys with setback penthouse above) comprising 6no. studio, 9no. 1 bed and 22no. 2 bed. The 4 blocks are connected by link corridors at ground floor level and are arranged around a central landscaped courtyard open to the south. The blocks are located above basement (1 level) which will accommodate 160 spaces car parking including universal access parking (6 spaces) electrical charge points (14 spaces), bicycle parking (408 spaces), motorcycle parking (8 spaces) and ancillary storage/ bin storage and circulation areas. At surface level at the entrance to the development there are an additional 11no. car parking spaces, including 1no. universal access space, 2 electrical charge point spaces and 24 bicycle spaces. In total, 171 no. car parking spaces and 432 bicycle parking spaces are provided. Permission is also sought for hard and soft landscaping, play areas, lighting, standalone ESB Substation building with access from Murphystown Road (26sqm) and all associated site and development works, including proposals for off-site improvements to the Murphystown Road cul-de-sac. Vehicular access is provided from a single access point from Murphystown Road, to the north of the site. Pedestrian entrances are provided from Murphystown Road to the north, Kilgobbin Road to the west and Murphystown Way to east of the site. A new access point for the existing dwelling at Lisieux Hall is to be provided from Murphystown Way and will also provide emergency access to the proposed development. The proposed development involves the removal of portions of the perimeter boundary wall and what remains of the walled garden at Lisieux Hall (Protected Structure). The application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire-Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.lisieuxhallshd.ie / 0.1 km away / 06 October 2020Granted