D04A/1365: Retention of existing first floor mezzinine structure
Aubrey Edge Factory Unit, Solus Towers Industrial Estate, Bray, Co. Dublin.
DecisionGrant permission for retention
Decided18 January 2005
Application typePermission for Retention
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D04A/1366For erection of gas storage tank to rear of existing Industrial Unit / 0.0 km away / 18 January 2005Granted
- D06A/0538For the erection of new two storey light industrial unit / 0.0 km away / 13 June 2006Granted
- D03A/04842 two storey light industrial units, No's 11a and 11b (ridge height to match tha / 0.0 km away / 15 July 2003Granted
- D05A/1081Retention permission sought for 6.2 sq.m boiler house / 0.0 km away / 13 October 2005Granted
- D09A/0355Planning permission is being sought for the following; 1. retention of developme / 0.0 km away / 15 July 2009Granted
- D23A/0518Retention of development comprising of mechanical ductwork, located to the rear/south facing elevation of unit no. 22. / 0.0 km away / 21 September 2023Granted
- D04A/06782 no. 86 sq.m. semi detached dwellings together with connection / 0.1 km away / 12 August 2004Granted
- D04A/1517For a residential development comprising 88 no. apartments all with balconies / 0.1 km away / 26 May 2005Granted