D04B/0490: Retain the velux rooflight to the eastside of the new two storey dwelling.
5, Balally Road, Dundrum, Dublin 16
DecisionGrant permission for retention
Decided13 August 2004
Application typePermission for Retention
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D06B/0588Ground Floor Conversion and First Floor extension to side of No.2. / 0.0 km away / 22 August 2006Granted
- D07A/1588Permission to retain alterations to recently approved two storey house to side o / 0.0 km away / 17 January 2008Granted
- D04A/0218New vehicular entrance to rear. Access to be from Balally Road. / 0.0 km away / 03 June 2004Granted
- D05A/0999Realignment of 2 storey detached house 8700mm high granted permission / 0.0 km away / 26 September 2005Granted
- D18B/0545Permission sought for front porch, single storey extension at side incorporating / 0.0 km away / 13 February 2019Granted
- D13B/0065Permission consisting of a single storey extension to rear. / 0.0 km away / 17 April 2013Granted
- D02B/0297Single storey extension at rear, garage conversion at side, / 0.0 km away / 03 July 2002Granted
- D25A/0082I intend to apply for planning permission for the following development: 1. Ground floor porch with concrete roof to match existing garage roof. 2. First floor extension over existing garage with hip roof to match existing roof. 3. Retrofit works of new windows, external wall insulation, solar panels. 4. Widening of existing entrance and SuDS rainwater harvesting tank. All other associated ancillary works to facilitate the proposed development. / 0.1 km away / 24 March 2025Granted