D05A/0997: Permission for demolition of existing 4 bedroom detached dormer house
ANNAMOE, HAINAULT ROAD, FOXROCK, DUBLIN 18
DecisionGrant permission
Decided24 November 2005
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D21A/0811Full permission for (A) removal of 28sqm rear single / 0.0 km away / 02 November 2021Granted
- D04A/0749The development will consist of demolition of existing / 0.1 km away / 30 August 2004Granted
- D08A/0935Modifications to 3 no. 2 storey and attic level 5 bed approved dwellings / 0.1 km away / 09 October 2008Granted
- D22B/0339Permission for development. The development will consist of the demolition of 1 No. storey garage structure to the rear of the existing dwelling, the construction of (a) a single storey extension to the rear and side of the existing dwelling, (b) dormer extension to rear of existing at attic level, (c) 2 No roof lights to front roof of existing 2 No. rooflights to side of existing, 1 No. rooflights to rear and 2 No. rooflights to new structure to rear (d) associated internal alterations and external works. / 0.1 km away / 06 December 2022Granted
- V/079/252 Units / 0.1 km away / 11 November 2025Granted
- D25A/0957/WEBDemolition of existing single storey extensions front and side and the construction of single and two storey extensions to front side and rear, new verandah and porch to front, amendments to first floor fenestration, new rooflight to front, solar panels to new roof to side, new front boundary wall with relocated vehicular access and pedestrian gate, along with internal alterations and ancillary site works. / 0.1 km away / 11 February 2026Granted
- D13A/0224/EPermission for development consiting of the construction of 1 no. 2 storey / 0.1 km away / 08 May 2018Granted
- D13A/0224Permission for development consiting of the construction of 1 no. 2 storey / 0.1 km away / 27 June 2013Granted