D06B/0312: Comprising of 3 storey extension to rear of each house with top floor
2 & 3, Hill Cottages, Killiney, Co. Dublin
DecisionRefuse permission
Decided02 June 2006
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D09B/0447Permission is sought for: 1. Demolition and site clearance of an exiating / 0.0 km away / 22 December 2009Refused
- D09B/0206Planning permission is sought for extension and alteration, comprising a 2 store / 0.0 km away / 07 July 2009Refused
- D18A/0492Permission to construct a raised paved area, steps and perimeter wall / 0.0 km away / 18 July 2018Refused
- D04A/1046For demolition of existing coach house and replce with a detached 2 storey house / 0.1 km away / 04 November 2004Refused
- D10A/0123Planning permission for the removal of existing 2 storey dwelling house and / 0.1 km away / 28 April 2010Refused
- D07B/0993Replacing the existing roof with a new roof (ridge level approximately 1M higher / 0.1 km away / 13 February 2008Refused
- D04A/0322Demolition of the post office and the associated residential unit and the redeve / 0.1 km away / 20 May 2004Refused
- D08A/0020The development will consist of the replacement of the facade to the former / 0.1 km away / 28 February 2008Refused