D07A/0174: New two storey extension to the "Clevis" Residential Home to incorporate an addi
Leopardstown Park Hospital, Foxrock, Dublin 18
DecisionGrant permission
Decided05 April 2007
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Leopardstown Park Hospital, Foxrock, Dublin 18?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D03A/1117Single storey extension to existing chapel attached to existing hospital (Protec / 0.1 km away / 25 February 2004Granted
- D25A/0594/WEBThe proposed development will consist of: i) The demolition of existing buildings comprising c.104 sqm. of floor space including: the existing link building (c.62sqm. gross floor area) that connects the Glens building to the existing hospital, and three existing rooms to the south side of the main spine corridor, adjacent to the Day Care Centre (c.42 sqm); ii) The construction of a new c. 9,284 sqm. gross floor area extension to be developed to the south of the existing Leopardstown Park Hospital building which will consist of 2 no. residential care building blocks providing 125 no. single ensuite bedrooms (1 no. 2 storey residential care block containing 50 no. bedrooms and 1 no. 3 storey residential care block containing 75 no. bedrooms) along with day rooms, dining rooms, activity and therapy rooms, staff support rooms and kitchen facilities connected by a new single, 2 and 3 storey central circulation street which links back to the existing hospital at ground floor level. The new development will also include minor refurbishment to the existing hospital to accommodate the connection point to the new link for the proposed central circulation street. No works are proposed to Leopardstown Park House (A Protected Structure). iii) The construction of a new single storey Mechanical and Electrical Compound (c. 370 sqm. gross floor area).The Mechanical and Electrical Compound also contains an ESB Substation; iv) Reconfiguration of existing car parking layout to provide a total of 109 car parking spaces within the red line boundary, comprising: 99 standard spaces, 6 accessible spaces, and 5 parent and child spaces. A total of 22 spaces will have electric vehicle charging points, and ducting will be provided for an additional 44 electric vehicle charging points. A total of 5 motorcycle parking spaces will be provided. v) A new single storey, secure bicycle store enclosure (c. 27 sqm.) located to the east of the main entrance providing 12 no. long-stay bicycle spaces. Provision of 21 no. short-stay bicycle spaces (20 no. existing and 1 no. new cargo-bike space); vi) The relocation and repair of a 33m section of walled garden boundary railings and gates to replace the low-level garden wall (1990s construction), the reopening of an existing closed-up door way within the wall, and repair and refurbishment works to the original walled garden wall; vii) The planting of 4,940 new trees (168 semi-mature trees, 4,772 small trees) to mitigate the removal of 39 trees (net increase of 4,901 trees), and relocation of 5 existing orchard trees into woodland; viii) Proposed modifications to the existing road network within the campus to access the new extension and associated Mechanical and Electrical Compound, planted perimeter landscaping with fence along the north and west boundaries (c. 1.8m high on northern boundary and 2.4m high on western boundary), temporary construction compound and construction road to the west of the hospital and general landscaping modifications including tree removal and compensatory planting; ix) The proposed development also includes all ancillary site clearance, enabling, construction, site development and landscaping works, which include but are not limited to: temporary haul road and temporary construction compound, the diversion and upgrade of existing hospital campus site services, new infrastructural services, plant, SuDS drainage and attenuation measures, watermains and communications networks, the upgrade of the combined sewer and a new watermain along the access road to the north of the hospital and all required phasing, sequencing and site development works; x) An Environmental Impact Assessment Report (EIAR) and a Screening for Appropriate Assessment Report have been prepared in respect of the proposed development. / 0.1 km away / 20 November 2025Granted
- D09A/0398Planning permission sought for development which will consist of the installatio / 0.2 km away / 16 September 2009Granted
- D15A/0370Permission: Block K was permitted under Reg. Ref. D04A/0994. The proposed / 0.2 km away / 24 July 2015Granted
- D15A/0369Permission: Block K was permitted under Reg. Ref. D04A/0994. The proposed / 0.2 km away / 23 July 2015Granted
- D17A/1131Permission is sought for the change of use and internal reconfiguration within / 0.2 km away / 23 February 2018Granted
- D05A/0578Construction of 12 no. residential units / 0.2 km away / 04 July 2005Granted
- D04A/0994Mixed use development / 0.2 km away / 22 December 2004Granted