D07A/1584: Retention of the existing temporary lobby and the construction of a flat roof
The National Virus Reference Laboratory, University College Dublin, Belfield, Dublin 4
DecisionGrant permission
Decided18 January 2008
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near The National Virus Reference Laboratory, University College Dublin, Belfield, Dublin 4?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D07A/1757Construction in an existing void at lower ground floor of storage areas / 0.0 km away / 12 March 2008Granted
- D07A/0236Construction of a flat roof extension 0f c.82sqm in the courtyard to include the / 0.0 km away / 16 April 2007Granted
- D02A/0635Demolition of a two storey partially derelict bulding used / 0.0 km away / 16 September 2002Granted
- D17A/1075Permission for the demolition of a 3-storey bay to the north-west elevation of / 0.1 km away / 02 July 2018Granted
- D11A/0279Planning permission for development which will consist of the installation / 0.1 km away / 05 August 2011Granted
- D14A/0252Permission for development consisting of additions, alterations and removal / 0.1 km away / 20 June 2014Granted
- D20A/0029Permission for development on a site of c.0.41 ha / 0.1 km away / 17 June 2020Granted
- D20A/0028Permission for development. The proposed development relates to the provision of an academic building (the Centre for Creativity - c. 13,184sqm Gross Floor Area including basement) and all associated elements as part of the Future Campus Phase 1 proposals. The general height of the proposed building ranges from c.18.6 m up to overall height of c.48.88m (up to the highest of the proposed tower elements). The Centre for Creativity includes the provision of a study centre, a lecture theatre, workshop/studio/classroom facilities, ancillary exhibition spaces and all associated ancillary areas/facilities. The proposed development will consist of: Level 0 - Educational facilities including - forum (foyer/reception), study centre, UCD experience area, equipment room and demonstration spaces, workshops, studios/maker space areas, retail area, café and all associated ancillary areas/facilities. Level 1 - (including mezzanine areas) - Educational facilities including study centre, UCD experience areas, creative teaching spaces, offices and all ancillary support facilities. At mezzanine level - Educational facilities including study centre, workspaces, offices and all associated ancillary areas/facilities. Level 2 - Educational facilities including a lecture theatre, UCD experience area, studios/classrooms/study areas and all associated ancillary areas/facilities. Level 3 - Educational facilities including studio/classroom/study areas, UCD experience areas and all associated ancillary areas/facilities. Level 4 - Educational facilities including UCD experience area, creative teaching spaces, studios and all associated ancillary areas, facilities. Level 5,6 and 7 - Educational facilities including UCD Experience areas and all associated ancillary areas/facilities (including an observation areas at Level 7). At basement Level - Associated ancillary plant facilities, storage and ancillary areas/facilities, storage and ancillary areas/facilities. At roof level over part of level 2 and level 4- provision of a sedum roof (with a combined area c. 1184 sqm) and Photo Voltaic panels (with a combined area c. 230 sqm) and paved terrace (c. 270 sqm), associated plant, roof lights and roof access. The proposals also provides for associated landscaping including a stepped reflective pool (located at part of the south-west, north-west and north east elevations of the proposed Centre for Creativity) fronting the new campus Arrival Plaza (part of a separate planning application). an external south-facing courtyard forming part of the new Ardmore Quad (part of a separate planning application), an external service area, an external workshop terrace area at ground floor level, external storage facilities (c.91 sqm) and all site services and associated site development works. There are no works proposed to the existing Protected Structures within the University College Dublin Campus as part of this planning application. / 0.1 km away / 17 June 2020Granted