D08B/0416: Retention of a garden structure and summer house to the rear
Parousia, Torquay Road, Dublin 18
DecisionGrant permission for retention
Decided28 July 2008
Application typePermission for Retention
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D18A/0924Permission and Retention Permission for: 1. Retention Permission for / 0.0 km away / 21 November 2018Granted
- D14B/0317Permission to demolish the existing rear conservatory and utility area / 0.1 km away / 07 November 2014Granted
- D12A/0360Planning permission for development which is located within a Conservation / 0.1 km away / 19 October 2012Granted
- D14A/0341Permission for development consisting of modifications, widening and upgrading / 0.1 km away / 25 July 2014Granted
- D15A/0472Permission for refurbishment and extension of existing two storey detached / 0.1 km away / 19 November 2015Granted
- D19A/1026The development will consist of alterations to the existing / 0.1 km away / 15 September 2020Granted
- D25A/0573/WEBProposed construction of a two-storey extension and alterations to the existing house, including external insulation, the construction of a new single-storey sunroom, and all associated site works. Retention permission is sought for the demolition of a previously authorised sunroom. / 0.1 km away / 28 January 2026Granted
- D25A/0460/WEBRetention of development consisting of a home office extension to ancillary building / 0.1 km away / 30 July 2025Granted