D09B/0009: The construction of a raised timber deck on steel structure and concrete ramp to
7, Holmwood, Cabinteely, Dublin 18
DecisionRefuse permission
Decided03 March 2009
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D07B/0152Retention permission for shed structure to rear garden of existing two story dwe / 0.1 km away / 18 April 2007Refused
- D07B/0720Retention and alteration of a domestic shed to rear garden of existing two store / 0.1 km away / 02 October 2007Refused
- D19A/0673Permission. The development will consist of a change of use of an existing / 0.1 km away / 04 November 2019Refused
- D08B/0774(a) The construction of a 41sq.m two storey extension to the side, (b) The const / 0.2 km away / 15 January 2009Refused
- D09A/0691Permission is sought for the erection of 15 houses in total / 0.3 km away / 10 November 2009Refused
- D10A/0196Permission is sought for the erection of 16 houses in total, consisting of: 9 nu / 0.3 km away / 03 June 2010Refused
- D08A/0533(i) Demolition of existing boundary wall, side entrance gates / 0.3 km away / 02 July 2008Refused
- D08A/0368A new vehicular access, with masonry piers and timber gates / 0.3 km away / 26 May 2008Refused