D10A/0104: Retention permission is sought for an electrical substation & ESB room
Carrickmines Substation Barringtontowers, Brennanstown Road, Carrickmines, Co. Dublin
DecisionRefuse permission for retention
Decided15 April 2010
Application typePermission for Retention
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- ABP31328122Planning permission for a strategic housing development consisting of the demolition of an existing habitable dwelling ‘Winterbrook’, and the derelict, former dwelling attached to Barrington Tower protected structure. ‘Barrington Tower’ itself will be retained and restored. It is also proposed to demolish the existing boundary wall to the north of the site along Brennanstown Road. The development will provide a ‘Build to Rent’ (BTR) apartment development consisting of 8 no. blocks ranging in height up to 10 storeys (including lower ground floor) providing a total of 534 no. apartments. This will comprise of: 30 no. studio, 135 no. 1 -beds, 318 no. 2-beds & 51 no. 3-beds. All residential units provided with associated private balconies/terraces to the north/south/east/west elevations. Resident Support Facilities & Resident Services & Amenities (total floor area c.1,496 sq.m) including flexible spaces including entertainment rooms, meeting rooms, parcel rooms, media rooms, lounge and workspaces, gyms and studio, chef’s kitchen and dining area. A creche (c.356.5 sq.m), and a retail unit (c.336.8 sq.m). Car and cycle parking at basement (2 levels) and at ground level. This will provide 419 no. car parking spaces, 1,266 no. cycle parking spaces and 17 no. motorcycle spaces. All associated site development works, open spaces and landscaping, boundary treatments, plant areas, waste management areas, cycle parking areas, and services provision (including ESB substations). Vehicular/pedestrian/cyclist access from Brennanstown Road will be provided along with improvement works to the Brennanstown Road including a new junction and pedestrian crossing facilities. Pedestrian/cyclist access through the site to the Brennanstown Luas Stop will also be provided. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant Dun Laoghaire Rathdown County Development Plan 2016-2022 (currently in force), the Dun Laoghaire Rathdown County Development Plan 2022 – 2028 (adopted, due to come into force on the 21st April 2022) and the Cherrywood Planning Scheme 2014 Strategic Development Zone. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report and a Natura Impact Assessment have been prepared in respect of the proposed development. The application together with the Environmental Impact Assessment Report and the Natura Impact Assessment may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.barringtontowershd.com / 0.2 km away / 12 September 2024Refused
- ABP31332222Permission for development at this site. The site comprises land adjacent the Carrickmmines Stream and Carrickmines Luas Park & Ride. The application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme, 2014 (as amended). The development will comprise a mixed-use Village Centre and residential development as follows: 402 no. apartments (comprising 146 no. 1-beds; 218 no. 2-beds and 38 no.3-beds) within 6 no. blocks (Blocks A-F) ranging in height up to 5 storeys with basement/undercroft parking areas. 41 no. terraced/semi-detached/detached houses (comprising 19 no. 3-beds and 22 no. 4-beds). A supermarket (c.1,306 sq.m), 7 no. retail/retail services units (c.715 sq.m total gross floor area); 2 no. non retail/commercial units (c.213 sq.m total gross floor area); creche (c.513 sq.m), gym (c.155 sq.m), community space (c.252 sq.m) residential facilities (c551.8 sq.m total gross floor area), office/high intensity employment use (c.708 sq.m). Provision of car/bicycle/motorcycle parking at basement/undercroft/ground level. ESB sub-stations/switchrooms/kiosks, waste storage areas, plant areas. Provision of the first phase of Priorsland Public Park along the Carrickmines Stream and additional public and communal spaces. Provision of an acoustic barrier along the southern/ south-western edge of the site adjacent to the M50. Construction of Castle Street on the subject lands and two road bridges across the Carrickmines Stream, one to serve a future school site, the second to provide interim pedestrian and cyclist access to the Carrickmines Luas Station and future Transport Interchange. Provision of a pedestrian bridge from the Village Centre to Priorsland Park. The proposed development includes for all associated site development works landscaping, boundary treatments and service provision. The application contains a statement setting out how the proposal will be consistent with the Dun Laoghaire -Rathdown County Development Plan 2016-2022 (currently in force) and the Dun Laoghaire - Rathdown County Development Plan 2022-2028 (adopted, not yet in force), and the Cherrywood SDZ Planning Scheme, 2014 (as amended). An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development / 0.2 km away / 20 November 2024Refused
- DZ21A/0677Permission for development. The application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme, 2014 (as amended). The development will comprise a mixed-use Village Centre and residential development as follows: 404 no. apartments (Comprising 141 no. 1-beds (ranging in size from c.45 sq.m to 61.1 sq.m), 225 no. 2-beds (raging in size from c.63 sq.m to 89.5 sq.m), and 38 no. 3-beds (ranging in size from c.90 sq.m to c.122 sq.m)) within 7 blocks ranging in height from 4 to 5 storeys and with 4 no. basement/undercroft parking areas. 41 no. houses (comprising 19 no. 3-beds and 22 no. 4-beds) ranging in size from c.1115 sq.m to c.146 sq.m. A supermarket (c.1,315 sq.m), 7 no. retail/ retail services units (c.823 sq.m total gross floor area) ranging in size from c.55.8 sq.m to c.178 sq.m), 3 no. non-retail commercial units (c.347 sq.m total gross floor area) ranging on size from c.88 sq.m to c.138 sq.m), creche (c.486 sq.m), gym (c.155 sq.m), community space (c.253 sq.m), residential facilities (c.299 sq.m total gross floor area) within 2 no. units, office /High Intensity Employment use (c.998 sq.m). 627 car parking spaces. 605 no. bicycle parking spaces with 472 no. provided within 11 no. bike stores (totalling c.782 sq.m) located at basement/undercroft/surface level. 5 no. ESB sub-stations/switchrooms (totalling c.51 sq.m). Gas skid (c.4.8 sq.m). 11 no. waste storage areas (totalling c.401 sq.m). 7 no. plant areas (totalling c.516.70 sq.m). Provision of a new public park and a park/greenway along the Carrickmines Stream. Provision of an acoustic barrier along the southern/south-western edge of the site adjacent the M50. Construction of Castle Street on the subject lands and two bridges across the Carrickmines Stream, one to serve the future school site, the second to provide pedestrian and cyclist access to the Carrickmines Luas station and future Transport Interchange and adjoining 3rd party development lands to the north. In accordance with Section 7.2.2 of the Cherrywood Planning Scheme, 2014 (as amended) it is proposed to utilise an existing Right of Way to the west of the application site, to facilitate construction access to/from Glenamuck Road North Roundabout for an interim period until such time as the remainder of Castle Street (on third party lands to the east of the application site) is completed and becomes available for construction and operational traffic. The proposed development includes for all associated site development works, landscaping, boundary treatments and services provision. The total gross floor area of the proposed development is c.48,606 sq.m with c13.058 sq.m of basement/undercroft parking area. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development. / 0.2 km away / 15 September 2021Refused
- D08A/0496Construction of a two stroey dwelling incorporating a basement, for alterations / 0.3 km away / 25 June 2008Refused
- D10A/0196Permission is sought for the erection of 16 houses in total, consisting of: 9 nu / 0.4 km away / 03 June 2010Refused
- D09A/0691Permission is sought for the erection of 15 houses in total / 0.4 km away / 10 November 2009Refused
- D03A/0428Construction of 4 no. five bedroom two storey houses and ancillary site / 0.5 km away / 25 June 2003Refused
- D14A/0649Permission for the construction of 17 no. dwellings comprising 1 no. 5 bedroom / 0.5 km away / 01 December 2014Refused