D19A/0284: Permission for a new external door to existing single-storey linking building
Saint Patrick's Church (A Protected Structure RPS No. 1425) & Saint Patrick's Parish Centre / Dalkey National School Building (A Protected Structure RPS No. 1426), Harbour Road, Dalkey, Co Dublin
DecisionGrant permission
Decided18 June 2019
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Saint Patrick's Church (A Protected Structure RPS No. 1425) & Saint Patrick's Parish Centre / Dalkey National School Building (A Protected Structure RPS No. 1426), Harbour Road, Dalkey, Co Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D14A/0049Permission for replacement of existing dormer window, provision of new / 0.0 km away / 28 May 2014Granted
- D16A/0824Permission is sought for demolition of part single-storey and part two-storey / 0.0 km away / 10 January 2017Granted
- ABP30662620Permission for a strategic housing development consisting of (a) the demolition of ‘Charleville’ (now vacant, but previously used by a charitable organisation and not in residential use); the ‘Coach House’ (vacant); all associated ancillary buildings (total approx. 1,327.1 sq m GFA); and the front site boundary wall; and (b) the construction of a new residential scheme of 105 apartment units in 2 no. blocks (4 storeys over basement plus 5th storey setback) as follows: Block A comprises 53 no. apartments (28 no. 1 bed units, 24 no. 2 bed units and 1 no. 3 bed unit) Block B comprises 52 no. apartments (21. 1 bed units, 30 no. 2 bed units and 1 no. 3 bed unit) A single storey residential amenity building (approx. 195 sqm) will be provided between the two blocks. Each residential unit has associated private open space in the form of a balcony/terrace/roof terrace. Public open space is also proposed in the form of central courtyard areas, active landscaping, rain gardens and play areas (approx. 2,330 sqm). A basement area (total approx. 3,255 sqm) is proposed on one level below Blocks A and B. A total of 86 no. car parking spaces (all at basement level and including car sharing and EV spaces); 154 no. bicycle spaces (132 no. at basement level and 22 no. at surface level); and 6 no. motorcycle spaces (all at basement level) are proposed. Waste Management areas are located at basement level and an ESB substation and switch room are located at surface level. The Spy Tower will be retained within the current proposal and any works to this structure will relate solely to landscape proposals. No other development works are proposed to this structure. The development shall be served via a new vehicular and pedestrian access points from Harbour Road. The associated site and infrastructural works include provision for water services; foul and surface water drainage and connections; attenuation proposals; permeable paving; green roofs and PV panels at roof level; all landscaping works; boundary treatment works; internal roads and footpaths; and electrical services. The application contains a statement setting out how the proposal will be consistent with the Dún Laoghaire Rathdown County Development Plan 2016-2022. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. A Natura Impact Statement has been prepared in respect of the proposed development. The application, together with the Natura Impact Statement, may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dún Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.harbourroadshd.ie / 0.1 km away / 27 July 2020Granted
- D26B/0151/WEBFor removal of existing chimney and existing sloped roof to front elevation, construction of a new gabled pitched tiled roof to front elevation, to incorporate new first floor accommodation within roof space, new dormer to east elevation of proposed pitched roof for stair access to first floor; new velux rooflights to east and west elevations of proposed new pitched roof; new single storey extension with pitched roof to front elevation; alterations to rear flat roof to provide new insulation and parapet detail to roof; alterations to existing side elevation roof to from new entrance canopy; alterations to existing windows to west elevation; new window to east elevation; removal of railings to front elevation terraces and replacement with rain garden planting boxes; internal alterations and all associated site works / 0.1 km away / 05 May 2026Granted
- D20A/0355Permission for development. The proposed development will consist of the construction of 1 no. 2 bed, split level dwelling (approx. 96.8 sqm GFA) at approx. 2.7 m to 5.9 m in height with associated private open space, 1 no. car parking space, bicycle storage, 1 no. PV panel at roof level, bin storage, boundary treatment works and all associated site development and site services works. New gated vehicular and pedestrian access will be provided to the site via Harbour Road, and a new pedestrian access will be provided to the site via Rocklands. / 0.1 km away / 24 November 2020Granted
- D23A/0499(a) The reconfiguration of front garden access steps (including provision for external, accessible platform lift) and new, extended landing/terrace area outside living room (with new storage area below accessed from existing garage). (b) New 3sqm entrance porch/projecting bay at existing dining room window. (c) Front living room window replaced by patio door at existing house. / 0.1 km away / 14 September 2023Granted
- D23B/0440Proposed external alterations to include, Partial demolition, new external opes and alterations to existing opes, new entrance and relocated external entrance steps, together with associated site works to a detached two storey dwelling. / 0.1 km away / 15 November 2023Granted
- D12A/0518Permission for developments at this site. The development will consist of / 0.1 km away / 25 March 2013Granted