D19A/0741: Retention Planning Permission for development at this site
Unit 64C, Heather Road, Sandyford Ind Estate, Dublin D18WV83
DecisionGrant permission for retention
Decided28 November 2019
Application typePermission for Retention
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D04A/1191For an extension of the existing building to provide additional offices and / 0.0 km away / 10 December 2004Granted
- D19A/0535Permission is sought for 2no. windows to north elevation (2.25x1.05m and / 0.0 km away / 17 September 2019Granted
- D18A/0966Permission for Retention of 2.8 x 3.1m wide x 2.6m high free standing weather / 0.0 km away / 26 March 2019Granted
- D16A/0558Permission for new 2.2m wide x 2.25m high door set to south elevation. / 0.0 km away / 22 September 2016Granted
- D16A/0415Permission for new 2.2m wide x 2.25m high door set to north elevation. / 0.0 km away / 27 July 2016Granted
- D16A/0254/E1Permission consisting of: the demolition of the existing security structure (9 sqm); the construction of 3 no. 5 storey buildings for office use (referred to as Buildings A1, A2 and A3) with a total gross internal floor area of 26,030 sqm (comprising 24,950 sqm office floor area, 997 sqm enclosed plant at roof level and 83 sqm bicycle storage at ground floor level) above a stepped basement level (9,841 sqm gross internal floor area including a part-mezzanine basement level at Building A2 (942 sqm) to accommodate car and motorbike parking, plant, tanks, storage rooms, internal long-term bicycle parking and associated cyclist facilities). The buildings are each set back to provide external terraces at the 5th storey. The development will also consist of: the construction of an interim access arrangement comprising a two way road (c.230m in length), in lieu of the existing access road, to provide access to the proposed development and the existing uses (including works to integrate access to the development from the existing roundabout, Leopardstown Road), pending the development of the permanent Link Road permitted under Part 8 Ref. PC/07/13 (Link road and Link to Arena Road). The development will also consist of: all hard and soft landscaping; provision of new boundary treatments and partial removal of existing boundary treatments; external lighting; signage; changes in levels; SUDS measures including surface level water features; green roofs; brise soleil canopies comprising photovoltaic panels and fritted glass at roof level; switchrooms and substations; internal roadways; surface level set down spaces; short term external bicycle parking and all site excavation and development works and services above and below ground. An Environmental Impact Statement (EIS) will be submitted to the Planning Authority with the planning application. / 0.1 km away / 13 January 2021Granted
- D16A/0254Permission consisting of: the demolition of the existing security structure / 0.1 km away / 03 June 2016Granted
- D07A/0672Retention permission for a change of use from manufacture and storage to a servi / 0.1 km away / 11 July 2007Granted