D19A/0887: Permission for the construction of a new
Nypro, Corke Abbey, Bray, Co Dublin A98 R208
DecisionGrant permission
Decided17 December 2020
Application typePermission
Source documents7
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Nypro, Corke Abbey, Bray, Co Dublin A98 R208?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Planners ReportSource: planningapi.agileapplications.ie / KOD0QZ9.pdf / Document 2317737Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / KOD02JSW.PDF / Document 680724Source PDF
- ReportsSource: planningapi.agileapplications.ie / D19A0887FI_Nypro_Corke_Abbey_Avenue_Bray.doc / Document 2082307Source PDF
- ReportsSource: planningapi.agileapplications.ie / D19A0887FI_Nypro_Corke_Abbey_Avenue_Bray.doc / Document 2082310Source PDF
- ReportsSource: planningapi.agileapplications.ie / 0_-_NO_OBJECTION_REPORT_-_MD.doc / Document 57912Source PDF
- ReportsSource: planningapi.agileapplications.ie / D19A0887_Nypro_Corke_Abbey_Avenue_Bray.doc / Document 58497Source PDF
- ReportsSource: planningapi.agileapplications.ie / KOD02JT5.PDF / Document 675375Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- D25A/0060/WEBPermission for (1) the construction of a 2-storey extension (2,430 sq. m. floor area) to Building 2 - eaves height of proposed extension will match existing eaves of Building 2; (2) the removal of an earth mound (c. 80m long x c. 20m wide x c. 2.5m high) and the realignment eastwards of internal circulation road and 24 no. car parking spaces; and (3) the relocation of 8 no. EV parking spaces, all at the rear of Building 2; (4) the relocation of 2 no. silos to the north side of the extension; and (5) the construction of additional covered bicycle parking (20. no. spaces), 1.6m high wall and railing on new retaining wall between overflow car park and realigned circulation road, 1.2m high railing to hard landscaped area, landscaping and all ancillary and associated works / 0.0 km away / 21 May 2025Granted
- D22A/0574Permission for the installation pf 3,225 no. solar photovoltaic (PV) panels comprising an area of 5,965 sq. metres at roof level on the existing facility buildings and all ancillary and associated works. / 0.0 km away / 29 September 2022Granted
- D04A/0940New boundary fence to rear of Nypro Limited, the development will consist of / 0.0 km away / 11 October 2004Granted
- D14A/0026Permission for the construction of a new covered loading bay / 0.0 km away / 14 March 2014Granted
- D04A/0026Demolition of an existing warehouse and construction of a new 1,249 sq.m. wareho / 0.0 km away / 04 March 2004Granted
- D20A/0816Permission for the reconfiguration of the existing / 0.1 km away / 30 March 2021Granted
- D14A/0262Permission for Retention for overflow surface car park (58 no. car parking / 0.1 km away / 26 August 2014Granted
- D11B/0278Permission is sought to convert attic to living accommodation with dormer / 0.1 km away / 06 October 2011Granted