GrantedDecided 08 January 2020Dun Laoghaire Rathdown County Council

27 Windsor Park, Monkstown, Co. Dublin

Planning application D19B/0466
DecisionGrant permission
Decided08 January 2020
Application typePermission
Source documents2

Site

What is on file

0refusal reasons10conditions8nearby records

Proposed development

Application description published by Dun Laoghaire Rathdown County Council.
Permission for a 6sqm ground floor extension

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in entirety in accordance with lodged plans/particulars.Compliance
  • 2Revised drawings for written agreement required: front extension max 1.2m depth, rear dormer max 4.5m width, parapet wall reduced, boundary/walls clearly shown.Design Materials
  • 3Prevent mud/dirt/debris on public road or adjoining properties; repair any road damage.Construction Management
  • 4Surface water disposal per County Council requirements. New hardstanding areas to use gravel or permeable stone system.Wastewater Drainage
  • 5Entire house to be used as a single dwelling unit; no subdivision.Occupancy
  • 6External finishes, including roof tiles/slates, to harmonise in material, colour and texture with existing dwelling.Design Materials
  • 7Pay ?27.84 for Surface Water Public Infrastructure contribution.Development Contribution
  • 8Pay ?638.16 for Roads Public Infrastructure contribution.Development Contribution
  • 9Pay ?414.12 for Community & Parks Public Infrastructure contribution.Development Contribution
  • 10Development not to commence without prior written agreement on development contributions.Development Contribution

Planning a project near 27 Windsor Park, Monkstown, Co. Dublin?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Inside the decision file

Extracts from the council's own decision documents for this application — 13 pages of searchable text on file.

2 council documents — in the €39 site risk brief

Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 2 documents.

Source documents

Original council portal records and source PDFs where available.

2 council documents — in the €39 site risk brief

Site brief

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →