Rear of Fernhill, 9 The Woods, (with access onto Ballinclea Heights), Killiney, Co. Dublin
Planning application D20A/0229
DecisionGrant permission
Decided12 August 2020
Application typePermission
Source documents3
Site
What is on file
0refusal reasons10conditions8nearby records
Proposed development
Application description published by Dun Laoghaire Rathdown County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with submitted plans as amended by FI dated 21.07.2020.Compliance
- 2Permission relates specifically to plans amended by Option A of the FI dated 21.07.2020.Compliance
- 3Garage must be used exclusively for domestic purposes ancillary to the main dwelling. No human habitation or commercial/industrial use permitted.Occupancy
- 4a3.5m vehicular entrance must be recessed by minimum 1.5m from footpath. Adjacent boundary treatment recessed by minimum 1.5m for minimum 1m either side.Traffic Access
- 4bProposed sliding gate shall not be an automatic electronic gate.Traffic Access
- 4cFootpath in front of entrance must be dished and strengthened at applicant's expense, to satisfaction of utility company and Planning Authority.Traffic Access
- 4dApplicant must prevent mud, dirt, debris or building material from being carried onto or placed on the public road or adjoining properties.Construction Management
- 4eNecessary measures must be taken to avoid conflict between construction activities and pedestrian/vehicular movements on Ballinclea Heights and surrounding roads.Construction Management
- 5Parking/hardstanding areas must follow GDSDS for SUDS (permeable surfacing) and prevent drainage entering public road. Unbound materials must be contained.Wastewater Drainage
- 6Works restricted to 8am-7pm Mon-Fri, 8am-2pm Sat. No works on Sundays or Public Holidays.Construction Management
Planning a project near Rear of Fernhill, 9 The Woods, (with access onto Ballinclea Heights), Killiney, Co. Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 17 pages of searchable text on file.Included in site brief
3 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 2 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
3 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- D08A/1186/EDemolition of existing single storey house and / 0.0 km away / 24 January 2014Granted
- D08A/1186Demolition of existing single storey house and / 0.0 km away / 06 April 2009Granted
- D05A/0099Demolition of existing 2 storey over lower ground floor dwelling / 0.0 km away / 13 July 2005Granted
- D06B/0324For two new velux rooflights to front of existing side extension to one new / 0.0 km away / 02 June 2006Granted
- D04B/0881Dormer extension to side roof with high level window to enlarge existing bedroom / 0.0 km away / 16 February 2005Granted
- D06B/0908The erection of a two storey extension to front side and rear / 0.1 km away / 01 December 2006Granted
- D02B/0092Rear double extension to kitchen and bedroom. / 0.1 km away / 29 April 2002Granted
- D22A/0082Permission for the erection of a PV solar panel / 0.1 km away / 29 April 2022Granted