GrantedDecided 15 July 2020Dun Laoghaire Rathdown County Council

D20A/0314: Permission for alterations and additions to an existing 2-storey semi-detached dwelling. The proposed development will comprise the demolition of an existing single storey and conservatory extension to the rear, together with the demolition of an existing 2-storey extension to the gable end of the original dwelling. The proposed works will include the construction of a new 2-storey & part single storey extension to the rear, the construction of a new single storey extension to the gable end incorporating a new side access to the rear garden, together with the conversion of the existing attic space, and modifications to the main entrance to the front elevation. The proposed works will also include the widening of the existing front entrance gates, and all ancillary site works, including connections to existing services.

94 The Rise, Mount Merrion, Co. Dublin
DecisionGrant permission
Decided15 July 2020
Application typePermission
Source documents2

Site

What is on file

0refusal reasons8conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.

Conditions

  • 1Development carried out in accordance with lodged plans and particulars.Compliance
  • 2First-floor windows on south elevation of rear extension fixed, opaque or frosted, and permanently maintained as such.Other
  • 3Dwelling used as a single unit, no subdivision or separate habitable units.Occupancy
  • 4Surface water infiltrated locally to soakaway per BRE Digest 365, min 5m from foundations, no sewer overflow. Parking infiltrated via permeable surfaces.Wastewater Drainage
  • 5Widened entrance max 3.5m. Manual sliding gate. Footpath dished/strengthened. Gravel contained. Construction traffic measures to protect road users. No mud/debris on public road.Traffic Access
  • 6Payment of development contributions prior to commencement: €39.90 (Surface Water), €914.70 (Roads), €593.57 (Community & Parks) per DLRCC Development Contribution Scheme 2015.Development Contribution
  • 7No development without prior written agreement on development contributions.Compliance
  • 8Attic floorspace not complying with Building Regulations for habitable standards shall not be used for human habitation.Compliance

Planning a project near 94 The Rise, Mount Merrion, Co. Dublin?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →