D20A/0567: Permission is sought for development. The development will consist of the demolition of the existing two-storey over partial basement building and associated structures and the construction of a 3-7 storey mixed use building with 8 no. 2-bedroom apartments with associated recessed balconies and 1 no. commercial unit, the provision of part of a pedestrian route to facilitate a future connection from Rock Hill to the current public carpark and DART station to rear off Bath Place; the provision of vehicular access, 3no. undercroft car parking spaces, refuse area and bicycle storage at ground level to rear; drainage and all associated site and infrastructure works necessary to facilitate the development.
13-15, Rock Hill, Blackrock, Co. Dublin, A94V2NO
DecisionGrant permission
Decided04 August 2021
Application typePermission
Source documents13
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Planners ReportSource: planningapi.agileapplications.ie / KOD0LMM.pdf / Document 1561404Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / KOD0W49.pdf / Document 2348979Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / KOD0YWU.pdf / Document 3417044Source PDF
- ReportsSource: planningapi.agileapplications.ie / 200831084319-1031.pdf / Document 1555077Source PDF
- ReportsSource: planningapi.agileapplications.ie / ES_PR__D20A_0567_15_Rock_Hill_Blackrock.docx / Document 1558028Source PDF
- ReportsSource: planningapi.agileapplications.ie / D20A_0567_-_13-15,_Rock_Hill,_Blackrock_BE_20200923.doc / Document 1558709Source PDF
- ReportsSource: planningapi.agileapplications.ie / EM12964.docx / Document 1559759Source PDF
- ReportsSource: planningapi.agileapplications.ie / 0567_5o.pdf / Document 1561248Source PDF
- ReportsSource: planningapi.agileapplications.ie / D20A0567_FI_13-15,_Rock_Hill,_Blackrock,_Co_Dublin,_A94V2NO.doc / Document 2345484Source PDF
- ReportsSource: planningapi.agileapplications.ie / Email_msg_14556.pdf / Document 2359066Source PDF
- ReportsSource: planningapi.agileapplications.ie / D20A0567_CFI_13-15,_Rock_Hill,_Blackrock,_Co_Dublin,_A94V2NO.doc / Document 2360369Source PDF
- ReportsSource: planningapi.agileapplications.ie / 0567_28j_eho.doc / Document 2361590Source PDF
- AppealSource: planningapi.agileapplications.ie / Appeal.pdf / Document 3422996Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- D09A/0516Planning permission sought to extend existing 2 storey over basement / 0.0 km away / 28 October 2009Granted
- D02A/0649Change of use from residential to office (99.2 sq. m.) in / 0.0 km away / 23 August 2002Granted
- D08A/1119Material change of use of existing offices to waxing salon and proposed new sign / 0.0 km away / 03 March 2009Granted
- V/050/259 dwellings / 0.0 km away / 16 July 2025Granted
- D25A/0415/WEBWe Fad Saoil Saunas intend to apply for permission for development at this site: The yard to the rear of No.9 & No.11 Rock Hill, Blackrock, Co.Dublin (accessed via Bath Place, Blackrock, Co.Dublin). The development will consist of the change of use of the yard, currently operating as a car park, into a sauna recreational area. This will consist of the provision of the 2 sauna units, 1 communal plunge pool, changing area, reception, wc, shower area and all associated site works. / 0.0 km away / 17 July 2025Granted
- D16A/0595Permission for: 1. Retention permission for the use of the unit as a coffee shop / 0.0 km away / 03 October 2016Granted
- D05A/1109Erection of a replacement sign / 0.0 km away / 28 November 2005Granted
- D04A/0610The development will consist of the erection of a glazed entrance doors with / 0.0 km away / 19 July 2004Granted