Our Lady of the Wayside National School, 18 Ballybetagh Road, Kilternan, Dublin 18, D18 CY28
Planning application D22A/0210
DecisionGrant permission
Decided17 November 2022
Application typePermission
Source documents23
Site
What is on file
0refusal reasons25conditions8nearby records
Proposed development
Application description published by Dun Laoghaire Rathdown County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be carried out in accordance with submitted plans and FI/CFI responses.Compliance
- 2School and hall use limited to 7am-9pm Mon-Fri and 9am-5pm Sat/Sun.Occupancy
- 3Locker facilities to be provided adjacent to the hall shower for staff use.Other
- 4Detailed Construction Management Plan (CMP) to be submitted and approved prior to commencement, covering traffic management, site access, compound, staff parking, wheel washing, dust/noise mitigation, and complaints procedure.Construction Management
- 5Measures to avoid conflict between construction traffic and road users, and prevent mud/debris on public roads.Construction Management
- 6CEMP to include specific working hours (08:00-18:00 Mon-Fri, 08:00-14:00 Sat, no Sundays/Bank Holidays), dust monitoring, and continuous noise/vibration monitoring.Construction Management
- 7Construction waste records, Materials Source and Management Plan, Public Liaison Plan, and pest control plan to be implemented.Construction Management
- 8Construction runoff interception/treatment plan; drainage infrastructure to be cleaned before public network connection.Wastewater Drainage
- 9Green roof designed, installed, and maintained per BS EN 12056-3:2000 and SUDS Manual (CIRIA C753).Wastewater Drainage
- 10Hardstanding/parking to use permeable surfacing per GDSDS and CDP Section 12.4.8.3; unbound materials contained to prevent road transfer.Wastewater Drainage
- 11Existing outfall discharge rate not to increase; proposed drainage to not negatively impact downstream attenuation system.Wastewater Drainage
- 12Penstock provided in flow control device chamber (no bypass door); silt trap provided.Wastewater Drainage
Planning a project near Our Lady of the Wayside National School, 18 Ballybetagh Road, Kilternan, Dublin 18, D18 CY28?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 219 pages of searchable text on file.Included in site brief
23 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 16 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
23 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- D04A/0661The construction of a single storey temporary classroom (72 sq.m.) and / 0.0 km away / 10 August 2004Granted
- D02A/0339Single storey temporary classroom (72sqm). / 0.0 km away / 14 June 2002Granted
- D04A/0865Demolition of the existing water tower, shelter, ground floor toilet block. / 0.0 km away / 27 September 2004Granted
- D21A/0145Timber garden structure of 51.9 m2 / 0.1 km away / 16 April 2021Granted
- D23B/0298Permission is sought for single storey extensions to front (south) of house and / 0.1 km away / 03 August 2023Granted
- D06A/1007Construction of 2 no. 2-storey detached dwellings / 0.1 km away / 14 November 2006Granted
- D10B/0470Planning permission is sought for new dormer extension over existing / 0.1 km away / 26 January 2011Granted
- D21A/0232Permission for development. The development will consist of, / 0.1 km away / 08 October 2021Granted