RefusedDecided 20 July 2022Dun Laoghaire Rathdown County Council

D22A/0360: Permission for a mixed use development. The development will consist of: 1) demolition of the existing four-storey Creidim Centre (approximately 3,718 sq. m. (gross)) and one/two storey St Michael's House Grosvenor School (approximately 2,506 sq.m. (gross)) on the site; 2) Construction of a new three/four storey Creidim Centre (2,520 sq. m. (gross) with 18 no. surface car parking spaces (including 2 no. disabled spaces and 5 no. spaces with electric charging points), 2 no. motorcycle parking spaces, 32 no. surface cycle parking spaces (short stay) and 8 no. cycle parking spaces (long stay) and associated landscaped gardens; 3) Construction of a new two/three storey St. Michael's House Grosvenor Schools incorporating junior and senior cycles (3,412 sq. m. (gross)) with 32 no. surface car parking spaces (including 4 no. disabled spaces and 5 no. spaces with electric charging points), 2 no. motorcycle parking spaces, 20 no. surface cycle parking spaces (short stay) and 8 no. cycle parking spaces (long stay), 6 no. covered bus parking spaces and 8 no. bus set down queuing spaces and associated secure open space and play area; 4) Construction of a 22,733 sq. m. (gross) office development comprising two buildings; Block 1 - 10,062 sq. m. (gross) office space over four floors and Block 2 - 12,671 sq.m. (gross) office space over five floors above a single level basement accommodating 150 no. car parking spaces (including 6 no. disabled spaces and 30 no. spaces with electric charging points) 336 no. cycle parking spaces (long stay), 8 no. motorcycle parking spaces, staff changing/shower/toilet areas, service and plant areas, waste management areas and storage areas; 5) Provision of a central open space incorporating soft and hard landscaping and a pedestrian plaza and 168 no. surface cycle parking spaces (short stay) and 2 no. disabled car parking spaces; and all other associated site works required to facilitate the proposed development including the upgrading and realignment of existing access to site from Central Park and of the existing emergency access route from Leopardstown Road; internal access roads and pedestrian and cyclist routes; perimeter/boundary landscaping and fences; installation of signage on the southern elevation of the proposed Creidim Centre, on the entrance gate to the Creidim Centre and St Michael's House Grosvenor Schools car park and on the side of the canopy over the bus setdown area on the northern elevation of the St Michael's House Grosvenor Schools; and 1 no. single storey ESB substation/switchroom, store and waste compound building (105 sq. m.). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.

4.33 hectare site on, Leopardstown Road, Sandyford Business Estate, Dublin 18
DecisionRefuse permission
Decided20 July 2022
Application typePermission
Source documents29

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

Refusal reasons not machine-readable

Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near 4.33 hectare site on, Leopardstown Road, Sandyford Business Estate, Dublin 18?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →