The Courtyard Business Centre, Orchard Lane, Blackrock, Dublin
Planning application D22A/1037
DecisionGrant permission
Decided02 October 2023
Application typePermission
Source documents12
Site
What is on file
0refusal reasons12conditions8nearby records
Proposed development
Application description published by Dun Laoghaire Rathdown County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 2Permission granted for 13 apartments only. Each shall be used as a single dwelling unit and not subdivided.Occupancy
- 3-4Retain existing surface water runoff flow regime (on-site infiltration). Parking/hardstanding must use permeable surfacing per GDSDS SuDS recommendations and CDP Section 12.4.8.3, with measures to prevent runoff entering public realm.Wastewater Drainage
- 5Prevent mud/debris on public roads, avoid conflicts with pedestrians/vehicles during construction, and prohibit parking of construction vehicles on Orchard Lane.Construction Management
- 6Implement submitted CEMP. Maintain existing vehicular access to Corrig House. Provide cycle parking per DLRCC Standards (2018).Construction Management
- 7Implement Landscape Plan by Kinta Oakes in full within first planting season. Hard/soft works per approved plan. Plants per BS 3936. New plantings per BS 5837:2012. Replace dead/damaged plants within next season. Protect three existing trees per BS 5837:2012 with periodic consultant visits.Landscaping Boundary
- 8Submit Construction & Demolition Resource Waste Management Plan (RWMP) per EPA Best Practice Guidelines (2021) for written agreement prior to commencement.Construction Management
- 9Restrict heavy machinery operation to 8am-7pm Mon-Fri and 8am-2pm Sat. No annoying activities 7pm-8am. No night works without prior consultation. Notify affected parties if work outside hours is required.Construction Management
- 10Implement continuous dust monitoring at sensitive locations. Dust deposition outside site must not exceed 130mg/m2/day (BS method) or 350mg/m2/day (TA Luft) averaged over 30 days.Construction Management
- 11Appoint a community liaison officer to manage complaints, inform residents of progress, provide site notice with complaint means, and maintain a complaints log.Construction Management
- 12Submit full details of a properly constituted Owners' Management Company (OMC) for written agreement prior to commencement, showing areas to be taken in charge vs OMC maintained. Membership compulsory for all purchasers. Confirm setup prior to first occupation.Compliance
- 13Enter into Section 47 agreement restricting first occupation to individual purchasers and/or social/affordable/cost rental housing. Agreement applies for duration of permission unless unit remains unsold after 2 years from completion.Development Contribution
- 14Submit acceptable naming and house numbering scheme in Irish and English for written agreement prior to commencement or erection of advertising hoardings.Other
Planning a project near The Courtyard Business Centre, Orchard Lane, Blackrock, Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 95 pages of searchable text on file.Included in site brief
12 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 6 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
12 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- D04B/0641Single storey extension to livingroom and bathroom at rear. / 0.0 km away / 01 October 2004Granted
- D09A/0113Demolition of an existing two - storey existing end of terrace dwelling / 0.0 km away / 16 July 2009Granted
- D15A/0196Permission for partial demolition and alterations and two storey extension to / 0.0 km away / 18 May 2015Granted
- D03A/1055Demolition of the existing two bedroom one storey house and the development of 2 / 0.0 km away / 19 December 2003Granted
- D19B/0528Permission for development. the development will consist of / 0.0 km away / 20 February 2020Granted
- D08B/0268Second storey rear extension / 0.0 km away / 05 June 2008Granted
- D02A/0681Change of use of first floor from residential to office and / 0.0 km away / 29 August 2002Granted
- D11B/0127Permission is sought for the demolition of an existing single storey / 0.0 km away / 02 June 2011Granted