GrantedDecided 03 March 2023Dun Laoghaire Rathdown County Council

D23A/0026: The proposed works include the construction of a 70sqm flat roofed extension with 3no. rooflights to the rear and side at ground floor level. The proposal also includes a 2.7sqm extension to the garage at the front elevation and the inclusion of a new flat roof canopy across the front entrance. The extensions and remaining existing walls will have a smooth render and vertical timber clad finish. At first floor, the existing timber clad dormer to the front will be replaced with 2no. new zinc clad, flat roof dormers while to the rear the existing timber clad dormer will also be replaced with a full width timber clad flat roofed dormer. The proposal includes a new roof light to the front existing pitched roof. The permission will include the demolition of a 11.7sqm flat-roofed rear kitchen extension and 1no. chimney. It also includes the widening of the existing vehicular entrance to 3.4m, alterations to the internal layout, lowereing of the existing ground floor level and all associated site works.

31, Oakley Park, Blackrock, Dublin, A94X5H2
DecisionGrant permission
Decided03 March 2023
Application typePermission
Source documents5

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near 31, Oakley Park, Blackrock, Dublin, A94X5H2?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →