D23A/0497: A) The removal of existing shed structure and chimney to side of dwelling. B) Changes to fenestration to side of dwelling. C) external insulation to entire dwelling. D) Change of hip to gable roof to rear of dwelling to facilitate attic conversion, with new rooflights to side. E) Widening of existing vehicular entrance to 3.5m and all associated site works.
16, Waltersland Road, Stillorgan, Dublin, A94F593
DecisionGrant permission
Decided08 September 2023
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- D19B/0070Permission is sought for a) a loft conversion into two rooms and a WC, b) the / 0.0 km away / 11 June 2019Granted
- D07B/0786Conversion of an existing attic room, / 0.0 km away / 25 October 2007Granted
- D21A/0850Permission for development. The developemnt will consist of / 0.0 km away / 06 January 2022Granted
- D16A/0399Apply for Permission. The development will consist of demolition of the existin / 0.0 km away / 13 December 2016Granted
- D02B/0253Attic conversion and other works to existing house. / 0.1 km away / 18 June 2002Granted
- D05B/0751For construction of 2 storey dormer extension (37 sq.m.) to side / 0.1 km away / 13 December 2005Granted
- D09B/0468Permission is sought for the retention of the conversion of the single storey / 0.1 km away / 19 January 2010Granted
- D24A/0299Partially demolish the rear roof to allow the construction of two dormer box windows on rear elevation, adjustment of internal walls to increase overall area on first floor space. Maintain connection to public sewerage and surface water and all ancillary site works. Demolish part of front boundary wall and pier and increase the width of existing vehicle driveway entrance, dish public footpath in line with new entrance and all ancillary site works. / 0.1 km away / 20 June 2024Granted