GrantedDecided 10 October 2023Dun Laoghaire Rathdown County Council

D23A/0541: Permission for a development. The development will consist of a proposed material change of use and alterations to an existing three-story shop and office building. The existing building consists of a shop on the ground floor with storage facilities and stairs. The first and second floors consist of offices, storage facilities, stairs and toilets. The proposed development will consist of a material change of use on the first floor into a 2-bedroom apartment with a living/kitchen /dining room, 2 bedrooms, a bathroom, and storage facilities. The existing roof at first floor will be converted into a screened roof terrace. The second floor will consist of a material change of use into a 2-bedroom apartment with a living/ kitchen/ dining room, 2 bedrooms, stairs, a bathroom, a balcony and storage. The roof above the balcony will be modified accordingly. The development will include all modifications to existing services and connections ancillary to the development.

4 Georges Street Lower, Dun Laoghaire, Co. Dublin, A96 R296
DecisionGrant permission
Decided10 October 2023
Application typePermission
Source documents2

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near 4 Georges Street Lower, Dun Laoghaire, Co. Dublin, A96 R296?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →