D24A/0317: Install additional antennae on top of the existing 45m high telecommunications monopole structure to include all ancillary equipment (giving a total height of 48m to the top of the antennae) on behalf of the Commision for Communications Regulations (ComReg). To include associated ground mounted equipment within ESB telecommunications compound.
Carrickmines 220 KV Substation, Ballyogan Road, Carrickmines, Dublin 18
DecisionGrant permission
Decided02 July 2024
Application typePermission
Source documents3
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Carrickmines 220 KV Substation, Ballyogan Road, Carrickmines, Dublin 18?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- ReportsSource: planningapi.agileapplications.ie / D24A_0317_Carrickmines_220_KV_Substation,_Ballyogan_Road,_Carrickmines_CF_20240612_NO.docx / Document 4687427Source PDF
- ReportsSource: planningapi.agileapplications.ie / D24A_0317_Env_Enf_Report.docx / Document 4687647Source PDF
- ReportsSource: planningapi.agileapplications.ie / 0317__EHO_Report_12June24.pdf / Document 4687651Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- D07A/1676Alterations to previously approved Planning Permission Submission Reg. Ref. D07A / 0.0 km away / 24 January 2008Granted
- D10A/0318Permission (temporary 5 years) for a park and ride facility. This pay and displa / 0.1 km away / 26 October 2010Granted
- D24A/0361/WEBThe development will consist of alterations to the existing Carrickmines 220kV substation comprising of the erection of 3 no. acoustic screens, each being circa 12 m in height and circa 16 m in width and supported by a steel framework; the installation of a phase shifting transformer (PST); and all ancillary site development and site services works. / 0.1 km away / 12 July 2024Granted
- D26A/0204We, ESB Telecoms Ltd seek permission for the installation of solar panels on a steel frame structure over an existing telecommunications cabin (covering an area of approximately 48 sq.m., to a maximum height not exceeding 4.6 metres above ground level). Works to include all ancillary development works; all within ESB Telecoms Ltd Northern Telecommunications Compound. / 0.1 km away / 06 May 2026Granted
- D09A/0065Permission for development on this site ESB (Carrickmines) 220kV electrical tran / 0.1 km away / 28 July 2009Granted
- D12A/0407Peermission for development which will consist of alterations / 0.1 km away / 04 December 2012Granted
- D12A/0058Permission for development which will consist of alterations to the existing / 0.1 km away / 10 April 2012Granted
- D21B/0650Permission for proposed construction of a small low profile / 0.1 km away / 28 January 2022Granted