D24A/0400/WEB: The development consists of: alterations to the previously approved cycle/pedestrian bridge approved under Reg. Ref. D19A/0181 (ABP Ref. PL06D.305629). Planning permission is sought for (i) increasing bridge width at the southern entrance from 2m to 4m and relocating the existing handrail to facilitate this; (ii) omission of existing steps towards the northern entrance and replacement with guarded planting and provision of new steps with lower landing area; and (iii) provision of 8 no. bird nest boxes around the bridge area. Retention permission is sought for (i) the repositioning of the terminus points within Clonkeen Park and associated alteration to the gradient of the bridge; (ii) alterations to the bridge landing area between the existing buildings (the Highline and the Joinery); (iii) minor separation of central footpaths; and (iv) resurfacing bridge from loose gravel finish to a brushed concrete finish.
Clonkeen Park, Dún Laoghaire, Co. Dublin: Within the curtilage of 'The, Highline' & ‘The Joinery’ (Formerly known as ‘Mentec House’) at, Pottery Road, Dún Laoghaire, Dun Laoghaire Industrial Estate, Co Dublin
DecisionGrant permission for retention
Decided24 July 2024
Application typePermission for Retention
Source documents2
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Planners ReportSource: planningapi.agileapplications.ie / PlannersReport.pdf / Document 4695226Source PDF
- ReportsSource: planningapi.agileapplications.ie / D24A0400_Clonkeen_Park_&_'The_Highline'_&_‘The_Joinery’,_Formerly_‘Mentec_House’,_Dun_Laoghaire_Industrial_Estate,_Pottery_Road,_Dun_Laoghaire.docx / Document 4693590Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- D19A/0181Permission for: 1. Construction of a new pedestrian footbridge to Clonkeen / 0.0 km away / 17 September 2019Granted
- D18A/0980Permission for: 1. External and internal alterations to the ground floor of the / 0.0 km away / 21 January 2019Granted
- D19A/0732Permission for a) double-sided directional signage on Pottery road at the entrance to Dun Laoghaire Industrial Estate and b) miscellaneous directional / information signage in the undercroft of the Highline Building and in the vicinity of same. / 0.1 km away / 30 January 2020Granted
- D26A/0136/WEBThe change of use of areas designated as multi-media room; residents lounge; community function room; lobby, store & manager’s office on the ground floor of a permitted ‘Build to Rent’ development, Refs. D19A/0181 & PL06D.305629 to 2no. three bedroomed apartments (Apartments 1 & 2) for rental; New private open spaces to serve each unit with associated hedges & all necessary modifications to the layout of the subject areas, incl. to the communal open space; New glazed & landscaped winter garden to the northeast elevation; & Amendment of permission Refs. D19A/0181 & PLO6D.305629 to provide 28 no. external spaces & 73 no. internal spaces (101 total incl. 6 new spaces). / 0.1 km away / 21 April 2026Granted
- D14A/0483Permission for Change of Use of ground floor Unit 9 from office use to use as / 0.1 km away / 22 September 2014Granted
- D18A/0147Permission is sought for change of use from offices to cafe, / 0.1 km away / 11 June 2018Granted
- D08A/13891) Proposed change of use of 100sq.m opf floor area from light industrial to ret / 0.1 km away / 23 February 2009Granted
- D18A/0682Permission for Retention and completion of Change of Use from offices to / 0.1 km away / 24 October 2018Granted