D24A/0509: 14 Dwellings on a.69 Ha site. Demolition of a habitable house of 204.4sqm (known as The Grove) and the construction of a new residential development consisting 0f 14 detached, semi-detached and terraced houses ranging from 2-3 stories in height, 20 in-curtilage car parking spaces, 2 Sheffield cycle stands, 958sqm of public open space, landscaping and boundary treatments including tree retention, removal and new planting, water and utility services and connections, lighting and all enabling and ancillary development works above and below ground. Vehicular access is proposed from a new entrance onto Mart Lane. Pedestrian and cycling access is also provided from St. Brigids Park. The existing site boundary and pedestrian footpath along St. Brigids Park will be set back by 2m into the site for a distance of 52m to facilitate additional set down facilities along St. Brigids Park to be used in connection with St. Brigids Boys National School.
The Grove, Mart Lane, Dublin 18, D18Y9N2
DecisionRefuse permission
Decided03 September 2024
Application typePermission
Source documents26
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Planners ReportSource: planningapi.agileapplications.ie / Planners_Report_0509.pdf / Document 5211377Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1020.pdf / Document 4693763Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1021.pdf / Document 4693764Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1023.pdf / Document 4693766Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1024.pdf / Document 4693767Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1034.pdf / Document 4693777Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1036.pdf / Document 4693779Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1037.pdf / Document 4693780Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1038.pdf / Document 4693781Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1058.pdf / Document 4693801Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1060.pdf / Document 4693803Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1061.pdf / Document 4693804Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1062.pdf / Document 4693805Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1063.pdf / Document 4693806Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240717085322-1064.pdf / Document 4693807Source PDF
- ReportsSource: planningapi.agileapplications.ie / Public_Lighting_D24A-0509_July_2024.doc / Document 4695663Source PDF
- ReportsSource: planningapi.agileapplications.ie / EM13620-D24A-0509-The_Grove_Mart_Lane-.pdf / Document 4697555Source PDF
- ReportsSource: planningapi.agileapplications.ie / D24A-0509.doc / Document 4698594Source PDF
- ReportsSource: planningapi.agileapplications.ie / 0509_EHO_Report_14Aug24.pdf / Document 4698821Source PDF
- ReportsSource: planningapi.agileapplications.ie / D24A_0509_The_Grove_Mart_Lane_Dublin_18_D18Y9N2_CF_20240819.docx / Document 4700056Source PDF
- ReportsSource: planningapi.agileapplications.ie / 0509_Irish_Water_Report_26Aug24.pdf / Document 4701001Source PDF
- ReportsSource: planningapi.agileapplications.ie / D24A0509_The_Grove,_Mart_Lane,_Foxrock.doc / Document 4701825Source PDF
- AppealSource: planningapi.agileapplications.ie / D24A-0509_Appeal_docs_.pdf / Document 5455271Source PDF
- AppealSource: planningapi.agileapplications.ie / D24A0509_No_comment_.pdf / Document 5455339Source PDF
- AppealSource: planningapi.agileapplications.ie / D24A0509_ack_letter.pdf / Document 5455594Source PDF
- AppealSource: planningapi.agileapplications.ie / D24A-0509_ABP_Document_Request.pdf / Document 5459146Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- D25A/0531/WEBMart Lane Property Developments Ltd intends to apply for permission for the development of 21 no. dwellings on a 0.609 ha site at “The Grove”, Mart Lane, Foxrock, Dublin 14. The overall proposal relates to the demolition of a habitable house of 204.4 sq.m (known as ‘the Grove’), and the construction of a new residential development consisting of 21 dwellings (7 no. two bedroom duplex units; 7 no. three bedroom duplex units; 1 no. three bedroom semi-detached house and 6 no. four bedroom houses) ranging from 2 to 3 storeys in height; 26 in-curtilage car parking spaces, 3 no. covered bicycle stands; 1,023 sq.m of public open space; landscaping and boundary treatments including tree retention, removal and new planting; water and utility services and connections; lighting; waste management; and all enabling and ancillary development and works above and below ground. Vehicular access is proposed from a new entrance onto Mart Lane. Pedestrian and cycling access is also provided from St. Brigid’s Park. The existing site boundary and pedestrian footpath along St. Brigid’s Park will be set back by 2m into the site for a distance of 52 m to facilitate additional set down facilities along St. Brigid’s Park to be used in connection with St. Brigid’s Boys National School. / 0.0 km away / 27 August 2025Refused
- D14A/0587Permission for develompent consisting of the construction of a detached two-stor / 0.1 km away / 04 November 2014Refused
- D07A/0088Conversion, refurbishment & extension of the existing single-storey detached / 0.1 km away / 16 March 2007Refused
- D08A/0280Construct a 2 bed bungalow at rere of 24 Saint Brigid's Park, Foxrock with vehic / 0.1 km away / 02 May 2008Refused
- D05A/0331Construction of dormer bungalow at rear. / 0.1 km away / 12 May 2005Refused
- D06A/0284Demolition of a house and development of 2 no two storey 5 bedroom house / 0.1 km away / 25 April 2006Refused
- D08A/1259Permission for retention is sought for modifications to approved development / 0.1 km away / 21 January 2009Refused
- D08A/1135New vehicular entrance and 2 new off-street carparking spaces / 0.2 km away / 01 December 2008Refused