57, Woodlawn Park, Dublin 14. D14 AP64
Planning application D24A/0877
DecisionGrant permission
Decided18 March 2025
Application typePermission
Source documents6
Site
What is on file
0refusal reasons11conditions8nearby records
Proposed development
Application description published by Dun Laoghaire Rathdown County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be carried out in accordance with lodged plans/particulars as amended by FI received 21 Feb 2025.Compliance
- 2Unit restricted to single dwelling use; no subdivision or multiple habitable units.Occupancy
- 3External finishes to harmonise with existing dwelling.Design Materials
- 4Surface water to discharge locally to raised rainwater planters/raingarden per SuDS Manual (CIRIA C753). Hardstanding to follow GDSDS/SuDS with runoff prevention measures.Wastewater Drainage
- 5Construction measures to prevent debris on public road, repair damage, and avoid conflict with traffic/pedestrians.Construction Management
- 6Working hours restricted to 7am-7pm Mon-Fri, 8am-2pm Sat, no works on Sundays/Public holidays.Construction Management
- 7Payment of €134.73 for Surface Water Infrastructure per DLRCC Development Contribution Scheme 2023-2028.Development Contribution
- 8Payment of €2,021.01 for Transport Infrastructure per DLRCC Development Contribution Scheme 2023-2028.Development Contribution
- 9Payment of €11,317.65 for Community & Parks facilities & Recreational amenities per DLRCC Development Contribution Scheme 2023-2028.Development Contribution
- 10Prior written agreement with Planning Authority required regarding development contribution payment before commencement.Development Contribution
- 11Connection Agreement with Uisce Eireann required. Compliance with Uisce Eireann Standard Details/Codes of Practice. No build-over without written Confirmation of Feasibility (COF).Water Services
Planning a project near 57, Woodlawn Park, Dublin 14. D14 AP64?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 30 pages of searchable text on file.Included in site brief
6 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 3 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
6 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- V/079/24One Dwelling / 0.0 km away / 18 November 2024Granted
- D22B/0241Retention Permission for development. / 0.0 km away / 30 June 2022Granted
- D21B/0102Permission is sought for: emolition of existing / 0.0 km away / 28 April 2021Granted
- D20A/0059Permission for the conversion of existing / 0.0 km away / 19 March 2020Granted
- D04A/0395Conversion of the existing garage for use as a playroom including, the construct / 0.0 km away / 31 May 2004Granted
- D11B/0242Planning permission for proposed erection of a first floor erection / 0.1 km away / 09 September 2011Granted
- D25B/0573/WEBAlterations and extension to existing house to include; (a) Construction of new / 0.1 km away / 26 November 2025Granted
- D11B/0246Demolition of existing side garage / 0.1 km away / 13 September 2011Granted