D25B/0262: The development will consist of modifications to the permitted development Reg.
52, Ballinteer Park, Dublin 16, D16TE89
DecisionRefuse permission
Decided03 July 2025
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D18B/0321Permission for development at this site. The development will consist of: / 0.0 km away / 14 September 2018Refused
- D22B/0509The development will consist of Rear and side 2 storey extension for 2 first floor additional bedrooms. / 0.1 km away / 09 February 2023Refused
- D21B/0626Permission for development at this site / 0.1 km away / 09 August 2022Refused
- D07A/0486New attached 2 story, 2 bedroom house to side of existing dwelling with vehicula / 0.1 km away / 08 June 2007Refused
- D07B/0923A single storey extension and all associated works to the rear / 0.1 km away / 15 January 2008Refused
- D07B/0345Demolish existing single storey extension and construct two storey extension, co / 0.1 km away / 08 June 2007Refused
- D17A/0465Permission is sought for Retention Permission of works already carried out and / 0.1 km away / 14 July 2017Refused
- D10B/0422Permission is sought for the demolition of a one storey structure to the rear / 0.1 km away / 28 January 2011Refused