DZ20A/0877: Permission for development at this site.
Bishop Street, Cherrywood, Dublin 18, Co Dublin
DecisionGrant permission
Decided29 January 2021
Application typePermission (SDZ)
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bishop Street, Cherrywood, Dublin 18, Co Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Planners ReportSource: planningapi.agileapplications.ie / KOD0THN.pdf / Document 2323725Source PDF
- ReportsSource: planningapi.agileapplications.ie / 201203115624-1142.pdf / Document 2081636Source PDF
- ReportsSource: planningapi.agileapplications.ie / 20210114_DZ20A0877_GasDR_DAPT_Report_Final.pdf / Document 2320034Source PDF
- ReportsSource: planningapi.agileapplications.ie / DR200877.pdf / Document 2321949Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- DZ25A/0485/WEBThe proposed development will consist of the installation of 24 no. telecommunications antennas mounted on the building’s façade, together with 9 no. dishes, 3 no. equipment cabinets, and all associated equipment, to be located on the building’s facade and rooftop. The development will provide high speed wireless data and broadband services for all 3 of Irelands mobile operators, namely Eircom (t/a eir), Three Ireland and Vodafone Ireland. This application relates to part of the lands within Cherrywood Strategic Development Zone. / 0.1 km away / 01 August 2025Granted
- DZ26A/0032/WEBThe proposed development will consist of installation of 24 telecommunications antennas mounted on the buildings facade,Together with 9 no. dishes, 3 no/ equipment cabinets, 36 RRU's and all associated equipment, To be located on the buildings facade and rooftop. the development will provide highspeed wireless data and broadband services for all 3 of Irelands mobile operators, Namely Eircom (T/A EIR), Three Ireland and Vodaphone Ireland. This application relates to part of the lands within Cherrywood Strategic Development Zone. This application constitutes an amendment to the previously granted application (REF. DZ25A/0485/WEB) and the subsequent Disapproval of the compliance submission (REF. DZ25A/0485/WEB/3/C1). / 0.1 km away / 13 March 2026Granted
- DZ18A/0499This application relates to development with the Cherrywood Strategic / 0.1 km away / 11 January 2019Granted
- DZ26B/0241/WEBRetention Planning Permission is sought for the Permanent Retention of a single storey steel and glass enclosure/conservatory to a portion of her rear garden (approx 23.60sq.m.) at the rear of her existing house for the enjoyment of the family with a use directly associated to the use of the Family Home as a residential unit, and all ancillary site works. This planning application relates to a development that is within the Cherrywood Strategic Development Zone (SDZ), / 0.2 km away / 10 June 2026Granted
- DZ25A/0489/WEBRetention planning permission for a permanent retention of a single storey glass conservatory (22.4 sq.m.) to the rear of the existing residence, and all site works. This application relates to development within the Cherrywood Strategic Development Zone (SDZ). / 0.2 km away / 11 August 2025Granted
- DZ25A/0161/WEBThe development will consist of the completion of a c.145 metre section of Grand Parade road from the junction of Grand Parade and Tully Vale Road towards Bishop Street. The road was previously permitted as part of the infrastructure works granted under planning ref. DZ15A/0758. / 0.2 km away / 23 April 2025Granted
- DZ25A/0325/WEBLSREF V Eden M1 Limited Intend to Apply for Permission on this site In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. This application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as amended. The site of the proposed development is located in the Cherrywood Planning Scheme area and forms part of Development Area 7 – Macnebury. The site of the development proposed is generally bound by Bishop Street to the north, Cherrywood Avenue and permitted development under Reg. Ref. DZ24A/0017 to the east, the M50 to the west and development permitted under Reg. Ref. DZ22A/1021 and the Wyattvile Link Road to the south. The development proposed consists of a residential development consisting of 121no. residential apartment units (total c. 11,291sqm GFA) accommodated in 2no. blocks, ranging in height from 3 – 5 storeys. The overall development proposed comprises of the following: 121no. apartment units in 2no. blocks comprising: o Block A4 – 75no. units (11no. 1-bed, 50no. 2-bed and 14no. 3-bed) o Block A5 – 46no. units (11no. 1-bed, 27no. 2-bed and 8no. 3-bed) Provision of 99no. car parking spaces allocated to the proposed development. 98no. car parking spaces are providedat podium level with 1no. space provided at surface level. 4no. of these are accessible spaces and 20no. spaces are for Electric Vehicles; Provision of 159no. bicycle parking spaces, of which 133no. are long stay and 26no. are short stay. 4no. motorcycle parking spaces are also provided; The provision of c. 835sqm of courtyard gardens; Vehicular access serving the proposed development is via Cherrywood Avenue to the internal road arrangement permitted under Reg. Ref. DZ22A/1021 and Reg. Ref. DZ24A/0017; All ancillary site development and infrastructural works, including the provision of bike stores and bin stores, public lighting, private amenity space, hard and soft landscaping and boundary treatment works. The proposed development also consists of minor revisions to the Phase 1 and Phase 2A developments permitted under Reg. Ref. DZ22A/1021 and Reg. Ref. DZ24A/0017 respectively, comprising of landscaping amendments to the linear park, civic park link and on Tully View Street as well as to the permitted drainage arrangements. / 0.2 km away / 15 January 2026Granted
- DZ25A/0102/WEBLSREF V Eden M1 Limited Intend to Apply for Permission on a site In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. This application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as amended. The site of the proposed development is located in the Cherrywood Planning Scheme area and forms part of Development Area 7 – Macnebury. The site of the development proposed is generally bound by Bishop Street to the north, Cherrywood Avenue to the east, the M50 to the west and development permitted under Reg. Ref. DZ22A/1021 and the Wyattvile Link Road to the south. The proposed development comprises of amendments to development permitted under Reg. Ref. DZ24A/0017, consisting of: Removal of permitted basement floor level and reconfiguration of lower ground floor level resulting in a minor increase to cycle parking provision from 270no. spaces previously permitted to 272no. spaces now proposed. Reduction in total car parking quantum from 241no. spaces previously permitted to 160no. spaces now proposed, all of which will be situated at lower ground floor level; all associated site development and engineering works, including amendments to permitted drainage arrangements. The development as otherwise permitted under Reg. Ref. DZ24A/0017 remains unchanged. For clarity and avoidance of doubt, there is no change to any of the already permitted residential units in this case. / 0.2 km away / 26 May 2025Granted