DZ23A/0508: This application includes development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, As Amended. The development will consist of internal alterations and change of use within Building 5 to provide the following: (1) Unit 3 (248sqm) for use as a dental clinic (medical and related uses) and comprising the existing Unit 3 (Retail) and part of Unit 1 (vacant retail unit). (2) Unit 1 (76sqm) reduced in size and to accommodate a café/ restaurant use. Permission is sought for associated new shopfronts and signage to Units 1 and 3 and all associated site and development works.
Unit 3 and Unit 1, Building 5, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin
DecisionGrant permission
Decided22 September 2023
Application typePermission (SDZ)
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit 3 and Unit 1, Building 5, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Planners ReportSource: planningapi.agileapplications.ie / Report DZ23A0508.pdf / Document 4645653Source PDF
- ReportsSource: planningapi.agileapplications.ie / ES_PR_DZ23A_0508_-_Building_5_Cherrywood_Business_Park.docx / Document 4639659Source PDF
- ReportsSource: planningapi.agileapplications.ie / DZ23A_0508_EHO_Report___23AUG23.pdf / Document 4641225Source PDF
- ReportsSource: planningapi.agileapplications.ie / DAPT_Report_-_DZ23A0508_-_Building_5_CBP_COU.pdf / Document 4642998Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- DZ16A/0123Permission for the reconfiguration of existing round floor Units 1 & 2 of Block / 0.0 km away / 21 April 2016Granted
- DZ14A/0596Permission for the Change of use of Shop Unit 1 to Dental Clinic, amendments / 0.0 km away / 11 December 2014Granted
- DZ16A/0816Permission for Change of Use of existing vacant ground floor Unit 4 (110 sqm) / 0.0 km away / 10 January 2017Granted
- D07A/0233Extension and modifications to previously approved four storey mixed use facilit / 0.0 km away / 27 August 2007Granted
- D06A/0268For a four storey mixed use facilities buliding (Block C). The proposed / 0.0 km away / 16 June 2006Granted
- DZ19A/0255/EPermission for development consisting of: 1) Provision of 3 No. single-storey meeting pods (each measuring 28 sqm and c. 4.3m in height), elevated between 3.5m and 5.3m above ground, with rooflevel microgeneration wind turbines and solar panels, accessible via individual pedestrian bridges, all located to the east of Pond 4; 2) Erection of a 320 sqm canopy measuring 7m above ground level at its highest point, centrally located between Buildings 2, 3, 4, and 5; 3) Alterations to selected facades of Buildings 2, 3 and 4; 4) Landscaping works including inter alia: (a) the provision of a sunken garden located between Buildings 2, 3, 4 and 5, including stairs and a lift and a new connection to Basement Level, (b) provision of stairway from the Business Park (between Buildings 3 and 4) to the linear park, (c) improvement of part of the linear park, including landscaping grading, planting, pedestrian and cycle routes to connect to existing and previously permitted (Reg. Ref. DZ17 A/0122 and DZ18A/1104) paths, (d) associated hard and soft landscaping works, including works in the vicinity of Pond 4; 5) Provision of welfare facilities at basement level (increasing the basement floor area by 4.1 sqm); 6) Construction of a new vehicle access/egress ramp located to the north of Building 3, which will result in modifications to the Basement Level layout, including the reduction of 9 No. car parking spaces at Basement Level; 7) Modifications to the existing access/egress ramp located to the north-east of Building 4 to provide for cyclist use only; 8) Alterations to existing traffic circulation and car parking layout at surface level, resulting in the reduction in 24 No. car parking spaces at surface level; 9) Provision of bicycle stands and shelters at surface level; 10) Removal of 4 No. existing signs and the erection of 16 No. internally illuminated signs (6 No. single sided signs ranging in size from 0.62 sqm to 23.73 sqm; and 10 No. double sided signs (ranging in size from 2.48 sqm to 6.84 sqm); 11) Upgrade of existing public lighting; 12) Changes to levels, notably to the east of Pond 4 where additional fill is proposed to create viewing areas and access to proposed meeting pods; 13) Diversion of services (mechanical and electrical, water supply, communications, gas, sewage disposal and surface water disposal); 14) Provision of Sustainable Urban Drainage Systems, including bioretention areas and rain gardens; 15) All associated site development works above and below ground. The proposed development is located on a site of approximiately 4.28ha (with a devlopment area of 1.52ha) within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended}. / 0.0 km away / 30 April 2025Granted
- DZ19A/0255Permission / 0.0 km away / 03 December 2019Granted
- D08A/0121Retention of extension and modifications to Block C Facilities Centre at Cherryw / 0.0 km away / 24 June 2008Granted