DZ24A/0621/WEB: We, Manciano Limited, intend to apply for planning permission for development consisting of amendments to the development permitted under Reg. Ref.: DZ19A/0863, as extended under Reg. Ref.: DZ19A/0863/E, on lands within the townland of Brennanstown, Dublin 18. The application site is bound by Brennanstown Square to the north, Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south, Cabinteely Stream (partly) and Beech Park to the east. The lands are located in the Cherrywood Strategic Development Zone Planning Scheme area and forms part of the Development Area 5 (known as Druid’s Glen) within Cherrywood SDZ. Phase 01 of the permitted development is located to the north of the Cherrywood SDZ Planning Scheme’s Druid’s Glen Distributor Road (also known as P* to P3), currently substantially constructed and opened as a public road. This application relates to development in the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended). The proposed amendments, which relate to the Phase 01 area of the permitted development, consist of the following: • Provision of an additional 3 no. 2 storey, 3 bed terraced houses (House Type B1) and associated reconfiguration of the permitted surface parking area (including a reduction from 16 no. to 14 no. spaces); • Replacement of 4 no. 2 storey, 4 bed semi-detached houses and 1 no. 2 storey, 4 bed detached house, with 6 no. 4 bed terraced houses (new house types A1 & A2). This results in 1 no. additional house; • Reconfiguration of Block A, a 3 no. storey duplex building, to provide for 8 no. 3 bed duplex units, in place of 4 no. 3 bed and 4 no. 2 bed duplex units, and associated external alterations to fenestration and balconies; • All associated development, including car parking changes, cycle and bin storage, landscaping and site development works. The permitted development (under Reg. Ref.: DZ19A/0863, as extended under Reg. Ref.: DZ19A/0863/E) provides 342 no. residential units and the proposed amendments would result in an increase to 346 no. residential units.
Lands within the Townland of Brennanstown, Brennanstown, Dublin 18
DecisionGrant permission
Decided21 January 2025
Application typePermission (SDZ)
Source documents10
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Planners ReportSource: planningapi.agileapplications.ie / Planners_Report_DZ24A0621WEB.pdf / Document 5452053Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / Planners_Report_DZ24A0621WEB.pdf / Document 5470872Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / S146A EO.pdf / Document 5478226Source PDF
- ReportsSource: planningapi.agileapplications.ie / 240057-x-90-x-xxx-tn-dbfl-ce-0001-p4_1-transportation_t.pdf / Document 4698545Source PDF
- ReportsSource: planningapi.agileapplications.ie / DAPT_Report_-_DZ24A0621_-_Brennanstown-_Amendment.pdf / Document 5449026Source PDF
- ReportsSource: planningapi.agileapplications.ie / APPENDIX_A_DZ24A_0621_WEB_Manciano_DGR_Amendment_Environmental_Services_-_FTCo_report.pdf / Document 5449027Source PDF
- ReportsSource: planningapi.agileapplications.ie / Public_Lighting_DZ24A-0621-WEB_Sept_2024.doc / Document 5451272Source PDF
- ReportsSource: planningapi.agileapplications.ie / D24A_0621_Lands_within_Brennanstown_Road-Tudor_Homes.docx / Document 5460090Source PDF
- ReportsSource: planningapi.agileapplications.ie / DAPT_FI_-_DZ24A0621_-_Brennanstown-_Amendment_GRANT_20250109.pdf / Document 5469067Source PDF
- ReportsSource: planningapi.agileapplications.ie / Public_Lighting_DZ24A-0621-WEB_Jan_2025.doc / Document 5469984Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- DZ25A/0515/WEBPermission for development consisting of amendments to the development permitted under Reg. Ref.: DZ19A/0863, as extended under Reg. Ref.: DZ19A/0863/E and as amended under Reg. Ref.: DZ24A/0621/WEB, on lands within the townland of Brennanstown, Dublin 18. The application site is bound by Brennanstown Square to the north, Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south, Cabinteely Stream (partly) and Beech Park to the east. The lands are located in the Cherrywood Strategic Development Zone Planning Scheme area and forms part of the Development Area 5 (known as Druid’s Glen) within Cherrywood SDZ. This amendment application relates to Phase 02 and 03 of the permitted development, which is located to the south of the Cherrywood SDZ Planning Scheme’s Druid’s Glen Distributor Road (also known as P* to P3), recently opened as a public road. This application relates to development in the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended). The proposed amendments, which relate to the Phases 02 and 03 area of the permitted development, can be described as follows: - Redesign of Apartment Block E (now referred to as Block 2) to comprise 43 no. apartments, including 7 no. 1 beds and 36 no. 2 beds, in a 4 no. storey building with associated private terraces / balconies on the northern, southern, eastern and western elevations. There is no change to the total number of apartments in this block; - Replacement of 36 no. triplex units in Blocks F and G, with 1 no. 3 bed house and 9 no. 4 bed houses (comprising of 3 storey terraced housing); - Replacement of 12 no. duplex units in Block D1 with a new apartment block (referred to as Block 3) to comprise 43 no. apartments, including 7 no. 1 beds, 28 no. 2 beds, and 8 no. 3 beds, in a 4 no. storey building with associated private terraces / balconies on the northern, southern, eastern and western elevations; - Redesign of 8 no. duplex units in Block D2 (now referred to as Duplex Block D01) to comprise 12 no. 3 bed duplex units, in a 3 no. storey building with associated private terraces / balconies on the northern elevation; - Replacement of 48 no. apartments in Block H with 16 no. 3 bed duplex units in a 3 no. storey building (referred to as Duplex Block D02) with associated private terraces / balconies on the southern elevation; - Replacement of 24 no. triplex units in Blocks K and J with a new apartment block (referred to as Block 5) to comprise 42 no. apartments, including 7 no. 1 beds, 23 no. 2 beds, and 12 no. 3 beds, in a 4 no. storey building with associated private terraces / balconies on the northern, southern, eastern and western elevations; - Replacement of 44 no. 3 bed houses and 16 no. 4 bed houses, with 42 no. 3 bed houses and 30 no. 4 bed houses (comprising of 2 storey terraced housing); - Removal of permitted basement floor level located on the eastern part of the site (below the previously permitted Blocks E, F, G and H) and reconfiguration of the car parking at surface / ground level to provide 267 no. spaces; and -All associated development, including alterations to the internal road layout, cycle and bin storage, PV panels at roof level, plant, provision of an additional ESB substation (2 no. in total), open space, landscaping, drainage and site development works. The permitted development (under Reg. Ref.: DZ19A/0863, as extended under Reg. Ref.: DZ19A/0863/E and as amended under Reg. Ref.: DZ24A/0621/WEB), provides for 346 no. residential units and the proposed amendments would result in an increase to 353 no. residential units (i.e. 7 no. additional units in Phase 02 and 03). / 0.0 km away / 04 December 2025Granted
- DZ19A/0863/EPermission for a residential development at a site measuring approximately 8.24 ha in area. The development will consist of the construction of 342 new residential dwellings, comprising 189 no. apartments arranged in 4 blocks (all 4-storeys in height and comprising 15 x 1 bed units and 174 x 2 bed units); 28 No. duplex units (comprising 14 x 2 bed units and 14 x 3 bed units); 60 No. triplex units (comprising 40 x 2 bed units and 20 x 3 bed units) and 65 No. 4 bedroom houses (comprising a mix of detached, semi-detached and terraced house types) together with a Childcare Facility at ground floor level within Block C with a floor space of 249sq.m. (GFA), and ancillary open space. The proposed development includes for all associated infrastructural works to include the part delivery of the Cherrywood SDZ Planning Scheme's Druid's Glen Distributor Road (also known as Q to P3), measuring approximately 390 m in length to include the construction / completion of the part approved 3-span bridge (Option 1) over the Cabinteely Stream under Planning Ref. DZ16A/0587 (ABP Ref. PL06D.247915). It is noted that a portion of Road Q to P3 was also granted under Planning Ref. D15A/0385 (as amended by DZ19A/0622) and the road may be constructed under that permission. Permission is sought for the inclusion and utilisation of a temporary haul road (to be constructed by the Dún Laoghaire-Rathdown County Council Contractor as part of the Druid's Glen Road Q - P3 east of the Cabinteely Stream (up to a point CH 100m as defined on ATKINS Drawing No. 0101A). This temporary haul route would connect directly to the N11 via the proposed Junction Q and includes for a culvert, or temporary bridge crossing at the Cabinteely Stream. The proposed temporary haul route comprises a 4m wide unbound haul road approximately 160m long, and will be constructed from approximately CH 560m on Druid's Glen Road to a proposed site compound area to the west thereof measuring approximately 30m wide and up to 45m long in plan area and will be situated at, or above the 30m site contour. This site compound will be made available to the Dún Laoghaire-Rathdown County Council Contractor building the Druid's Glen Road from N11 to point P3. Following the sectional completion of Druid's Glen Road, the proposed temporary haul road will be available to accommodate construction traffic associated with the appointed contractor(s) responsible for the development of the subject lands (as per any planning permission granted). It is proposed that this temporary haul route would remain available until the permanent bridge crossing the Cabinteely Steam becomes operational. The development will also include the construction of: ancillary waste storage facilities; ancillary waste recycling collection area; associated car parking (total of 565 no. car parking spaces, comprising 257 spaces at basement level and 308 surface level spaces (including 9 no. ancillary car parking spaces in connection with the childcare facility); bicycle parking spaces (total of 492 no. cycle parking spaces, comprising 156 basement level spaces and 336 surface level spaces); a number of ancillary public open spaces; provision of boundary treatments; lighting; associated hard and soft landscaping (including changes in site levels and playground provision); associated infrastructural and site development works above and below ground (including 2 No. permanent water attenuation ponds and 1 no. temporary attenuation pond). The application site is located within the Cherrywood Strategic Development Zone. / 0.0 km away / 18 July 2024Granted
- DZ19A/0863Permission for a residential development at a site measuring approximately 8.24 ha in area. The development will consist of the construction of 342 new residential dwellings, comprising 189 no. apartments arranged in 4 blocks (all 4-storeys in height and comprising 15 x 1 bed units and 174 x 2 bed units); 28 No. duplex units (comprising 14 x 2 bed units and 14 x 3 bed units); 60 No. triplex units (comprising 40 x 2 bed units and 20 x 3 bed units) and 65 No. 4 bedroom houses (comprising a mix of detached, semi-detached and terraced house types) together with a Childcare Facility at ground floor level within Block C with a floor space of 249sq.m. (GFA), and ancillary open space. The proposed development includes for all associated infrastructural works to include the part delivery of the Cherrywood SDZ Planning Scheme's Druid's Glen Distributor Road (also known as Q to P3), measuring approximately 390 m in length to include the construction / completion of the part approved 3-span bridge (Option 1) over the Cabinteely Stream under Planning Ref. DZ16A/0587 (ABP Ref. PL06D.247915). It is noted that a portion of Road Q to P3 was also granted under Planning Ref. D15A/0385 (as amended by DZ19A/0622) and the road may be constructed under that permission. Permission is sought for the inclusion and utilisation of a temporary haul road (to be constructed by the Dún Laoghaire-Rathdown County Council Contractor as part of the Druid's Glen Road Q - P3 east of the Cabinteely Stream (up to a point CH 100m as defined on ATKINS Drawing No. 0101A). This temporary haul route would connect directly to the N11 via the proposed Junction Q and includes for a culvert, or temporary bridge crossing at the Cabinteely Stream. The proposed temporary haul route comprises a 4m wide unbound haul road approximately 160m long, and will be constructed from approximately CH 560m on Druid's Glen Road to a proposed site compound area to the west thereof measuring approximately 30m wide and up to 45m long in plan area and will be situated at, or above the 30m site contour. This site compound will be made available to the Dún Laoghaire-Rathdown County Council Contractor building the Druid's Glen Road from N11 to point P3. Following the sectional completion of Druid's Glen Road, the proposed temporary haul road will be available to accommodate construction traffic associated with the appointed contractor(s) responsible for the development of the subject lands (as per any planning permission granted). It is proposed that this temporary haul route would remain available until the permanent bridge crossing the Cabinteely Steam becomes operational. The development will also include the construction of: ancillary waste storage facilities; ancillary waste recycling collection area; associated car parking (total of 565 no. car parking spaces, comprising 257 spaces at basement level and 308 surface level spaces (including 9 no. ancillary car parking spaces in connection with the childcare facility); bicycle parking spaces (total of 492 no. cycle parking spaces, comprising 156 basement level spaces and 336 surface level spaces); a number of ancillary public open spaces; provision of boundary treatments; lighting; associated hard and soft landscaping (including changes in site levels and playground provision); associated infrastructural and site development works above and below ground (including 2 No. permanent water attenuation ponds and 1 no. temporary attenuation pond). The application site is located within the Cherrywood Strategic Development Zone. / 0.0 km away / 14 January 2020Granted
- DZ18A/0208Permission sought for a residential development at a site measuring approximately 6.57ha. The development will consist of the construction of 367 no. new residential dwellings, comprising 190 no. apartments arranged in 4 blocks, ranging in height between 4- to 5-storeys in height (comprising 15 x 1 bed units and 175 x 2 bed units): 24 no. duplex units (comprising 12 x 2 bed units and 12 x 3 bed units); 60 no. triplex units (comprising 40 x 2 bed units and 20 x 3 bed units) and 93 no. 4 bedroom houses (comprising a mix of detached, semi-detached, and terraced house types) together with a Childcare Facility with a floorspace of 233 sqm (GFA) and ancillary open space. The proposed development includes for all associated infrastructural works to include the part delivery of the Cherrywood SDZ Planning Scheme`s Druid`s Glen Distributor Road (also known as Q to P3), measuring approximately 390m in length to include the construction/completion of the part approved 3-span bridge (Option 1) over the Cabinteely Stream under Planning Ref. DZ16A/0587 (ABP Ref. PL06D.247915) immediately adjoining the application site to the east. The development will also include the construction of: ancillary waste storage facilities; ancillary waste recycling collection area; associated car parking (total of 607 no. car parking spaces, comprising 218 spaces at basement level and 389 surface level spaces (including 6 no. ancillary car parking spaces in connection with the childcare facility)); bicycle parking spaces (total of 300 no. cycle parking spaces, comprising 202 basement level spaces and 98 surface level spaces); a number of ancillary public open spaces; provision of boundary treatments; lighting; associated hard and soft landscaping (including changes in site levels and playground provision); associated infrastructural and site development works above and below ground (including 2 no. permanent water attenuation ponds and 1 no. temporary attenuation pond). / 0.1 km away / 04 February 2020Granted
- DZ16A/0587Permission for residential scheme comprising the lands of 6 no. existing houses: / 0.2 km away / 21 December 2016Granted
- D15A/0385Permission for development of a residentail scheme on a site comprising the land / 0.2 km away / 18 October 2017Granted
- DZ20A/0491Permission for development to amend part of a permitted / 0.2 km away / 19 October 2020Granted
- DZ20A/0362Permission for development to amend part of a permitted residential scheme (Reg. Ref. DZ20A/0056, which itself amends the parent permission: Dún Laoghaire-Rathdown County Council Reg. Ref. D15A/0385 (An Bord Pleanála Ref. ABP-300194-17)). The site includes some 0.77 hectares forming part of the Cherrywood Strategic Development Zone Planning Scheme. (For identification purposes, the Application site comprised the lands of 10 No. houses (now demolished under Permission Reg. Ref. D15A/0385) comprising: Foinavan, No. 8 Beech Park, Bray Road, Dublin 18 D18 A5N5; Woodbrook, No. 7 Beech Park, Bray Road, Dublin 18, D18 FA55; Lynwood, No. 6 Beech Park, Bray Road, Dublin 18, D18 A2R7; Corrente, No. 5 Beech Park, Bray Road, Dublin 18, D18 W7K7; Dun Baoi, No. 4 Beech Park, Bray Road, Dublin 18, D18 TW75; Teely Lodge, Bray Road, Dublin 18, D18 E0K1; The Galliard, Bray Road, Dublin 18 D18 H9E2; Capard, Bray Road, Dublin 18, D18 A2Y6; Greenhills, Bray Road, Dublin 18, D18 R9C0; El Dorado, Bray Road, Dublin 18, D18 T9C9; and Silver Slope, Bray Road, Dublin 18, D18 Y6H7 and the road area and associated open spaces at Beech Park, Bray Road, Cabinteely, Dublin 18/Loughlinstown, County Dublin, and its connection with the N11). The site is principally bounded by Centenary Service Station to the north; the N11 to the east; Nos. 2-4 Sunnyhill Park, Loughlinstown, to the south; and partly by the Cabinteely Stream and open space to the west. (The property identified as Wood Haven (Beech Park, Cabinteely, Dublin 18, D18 A6R9) located between Silver Slope and El Dorado, does not form part of this development). The proposed development will consist of: the extension of the permitted fourth floor level of Block F by some 49 sq m to facilitate the reconfiguration and extension of that floor, providing 7 No. one-bedroom apartments and associated elevational changes following the reconfiguration of 4 No. previously permitted apartments (3 No. two-bedroom and 1 No. one-bedroom apartments) and the provision of 3 No. additional apartments; the reconfiguration of permitted covered car parking (reducing from 66 No. to 61., but with a corresponding increase in external car parking provision from 33 No. to 38 No., with the previously permitted overall car parking provision for Block DEF remaining 99 No. spaces), bicycle parking (increased from 102 No. to 132 No. spaces), bin storage (increased from 51 sq m to 53 sq m) and circulation arrangements at Undercroft Level under Block C (of Block ABC) and Block DEF to provide for 2 No. residential amenity rooms (an aerobic fitness centre and associated WC of 73 sq m and a pet facilities' room of 12 sq m); the addition of 1 No. vent along the western boundary; alterations to permitted facade treatments and elevations of Block F at Undercroft level; and all other associated site excavation, and infrastructural and site development works, both above and below ground. (The floor area of the permitted Undercroft Level is not affected). The amendments to Block DEF will result in the provision of 66 No. two-bedroom apartments and 15 No. one-bedroom apartments.(69 No. two-bedroom apartments and 9 No. one-bedroom apartments were permitted under Applications Reg. Ref. DZ20A/0056; 66 No. two-bedroom apartments and 12 No. one-bed apartments are permitted under Application Reg. ref. D15A/0385.) The number of permitted units in Block DEF will change from 78 No. to 81 No. units. / 0.2 km away / 31 August 2020Granted