PC/IC/02/24: DLRCC Road Maintenance Operations Facility, Ballyogan
Vacant site adjacent to the existing Dún Laoghaire-Rathdown County Council Operations Centre, located at Ballyogan, Dublin 18
DecisionApproval for the proposal to proceed
Decided13 January 2025
Application typePart Vlll (public consultation)
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Vacant site adjacent to the existing Dún Laoghaire-Rathdown County Council Operations Centre, located at Ballyogan, Dublin 18?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- D25B/0693/WEBThe development will consist of demolition of single storey flat roof rear extension (19.76m.sq.), Construction of part single storey (total 7.77m.sq.) and part two storey extension (total 181.93m.sq.) to rear of existing bungalow, alteration & extension (0.5m.sq.) to existing front door entrance and associated site works. / 0.1 km away / 09 February 2026Granted
- D24A/0981/WEBUltra Dawn Limited intend to apply for permission for development on lands at Nos. 133 and 152 Ballyogan Road, Ballyogan, Dublin 18 (D18 F882 and D18 FN24). The development will consist of the demolition of the existing structures on site and the construction of a residential development comprising of 49 no. apartment units in 2 no. apartment blocks as follows: Block A providing a total of 24 no. apartments comprising of 8 no. 1 beds, 15 no. 2 beds, and 1 no. 3 bed, with internal bin store, bike store and switch room, in a building ranging from 4-5 storeys in height with PV panels at roof level, and Block B providing a total of 25 no. apartments comprising of 11 no. 1 beds and 14 no. 2 beds, with internal bin store, bike store, plant room and switch room, in a building 4 storeys in height with PV panels at roof level, with all apartments provided with private terraces/balconies; car parking; bike parking; new vehicular access on Ballyogan Road with associated road upgrades works including right turn lane and footpath works; landscaping including play equipment; boundary treatments; lighting; 1 no. ESB substation; and all associated site infrastructure and engineering works necessary to facilitate the development. / 0.1 km away / 02 May 2025Granted
- D08A/0354An extension of 420 m squared to the south and east sides of the existing Sortin / 0.1 km away / 17 July 2008Granted
- D15A/0579Permission for Retention of a Change of Use of unathorised development / 0.2 km away / 11 March 2016Granted
- D11A/0224Retention of unauthorised development i.e. extension to front / side / 0.2 km away / 05 August 2011Granted
- D17A/0757Permission is sought for a change of use from residential to commercial use / 0.2 km away / 06 December 2017Granted
- D25A/0910/WEBAn extension to previously proposed single storey building with multi-purpose room, storage, wc’s, bicycle parking and additional windows in the rear carpark area with adjustments to the parking layout. / 0.2 km away / 27 January 2026Granted
- D25A/0678/WEBA new double and single storey extension to the existing creche on side and front elevation with new entrance area, demolition of two single storey storage sheds along with proposed single storey multi-purpose building in the rear carpark area with adjustments to the parking layout. / 0.2 km away / 23 October 2025Granted