F07A/1116/E1: Single storey bungalow, waste water treatment system and all associate
Collinstown, Lusk, Co. Dublin
DecisionRefuse ext. of duration of permission
Decided14 December 2012
Application typeExtension Of Duration Of Permission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F16A/0295New bungalow accessed via private entrance road, new wastewater treatm / 0.1 km away / 22 August 2016Refused
- F10A/0391Construct a new 1 1/2 storey house with secondary treatment sytem and / 0.1 km away / 29 July 2011Refused
- F23A/0731The development will consist of a new single storey double garage cum shed to rear west corner of existing large back garden for domestic car parking and storage with trailers and other gardening mechanical machines. Also included are all associated site works and extended driveway to shed. / 0.1 km away / 29 January 2024Refused
- F25A/0548EThe development will consist of the construction of a detached four bedroom dormer dwelling with on-site wastewater treatment system, percolation area and rainwater harvesting system; new vehicular access to the R127; landscaping and boundary treatment; and all associated site works necessary to facilitate the proposed development. / 0.3 km away / 11 August 2025Refused
- F21A/0235Construction of (i) a new detached four bedroom single storey dwelling. (ii) revision of existing roadside boundary treatment along site to R127 to achieve adequate sightlines (iii) provision of new shared entrance to existing agricultural site entrance along R127 (iv) provision of new internal vehicular entrance and access driveway to serve proposed new dwelling and (v) all associated ancillary works necessary to facilitate the development including wastewater treatment system, percolation area, rainwater harvesting system, site works and landscaping and boundary treatment. / 0.3 km away / 14 June 2021Refused
- F13A/0395Permission for (a) Extensions & alterations to existing outbuilding (b / 0.4 km away / 10 December 2013Refused
- F24A/1162EThe development of an Anaerobic Digestion (AD) Facility to produce a renewable biomethane gas for direct injection into the national gas grid on a site of circa 7.28 hectares at the townland of Collinstown, Lusk, Co Dublin. The development comprises of AD tanks and processing equipment, feedstock storage facilities and equipment, silage storage clamps, digestate management and storage facilities. Carbon dioxide from the production of this biomethane will be captured for reuse in the Irish food industry. The proposed supporting infrastructure to be developed includes inter alia, 1 no. 45m diameter combined primary and secondary digestion tank (8.5m high, 7947m³ & 3981m³ respectively) & attached pumping unit, 1 no reception tank (5m high, 250 m³) & attached pumping unit, 1 no. 32m diameter power digest tank & attached gas sphere (12m high, 4.825m³ & 3130 m³ respectively) & attached pumping unit, 1 no. digestate separator building (119.5 m2), 1 no. pasteurization unit & hygenization buffer tank, 1 no. gas upgrading unit, 1 no. gas pre-treatment unit, 1 no. gas valve chamber, 1 no. gas flare (9m high), 1 no. GNI gas injection unit (25.1 m2) with an underground gas pipeline to the gas grid connection adjacent the site to the west, 1 no. combined heat and power unit, 2 no. boiler containers, 1 no. oxygen compound, 1 no. heat distribution container, 1 no. switchboard container, 1 no. carbon dioxide liquefaction unit, 2 no. weighbridges & integrated lever arms & access control & attached bio security units, 1 no. single-storey office and administration building (123 m2), 1 no. ESB sub-station (66 m2), 1 no. enclosed feedstock reception building (1527 m2), 1 no. odour abatement machinery (with 14m high chimney), Silage clamps (8m high), 1 no. machinery shed (309.4 m2), 1 no. services building (288.6 m2), 1 no. solid digestate storage building (484.1 m2), 2 no. covered digestate lagoons, attached pumping building (30 m2) and attached digestate loading-unloading areas, roof mounted solar arrays / photovoltaic panels, all associated car and bicycle parking, internal road layouts, earthen berms, site retaining walls, palisade fencing and boundary treatments, hard surface and bunded areas for housing supporting plant, processing and storage facilities and all associated site works. All accessed by the existing Country Crest internal road network which uses as public roadway access point to the L1155 Man o War Road. The facility requires an Industrial Emissions Licence from the EPA and is accompanied by a Natura Impact Statement (NIS) and an Environmental Impact Assessment Report (EIAR). / 0.6 km away / 20 February 2025Refused
- F14A/0039A. single storey detached bungalow, B. Wastewater treatement system, / 0.7 km away / 25 March 2014Refused