F08A/1248/E1: Modifications to previously approved warehouse (reg. ref. F08A/0786) t
Horizon Logistics Park, Harristown, St Margarets, Swords, Co Dublin
DecisionRefuse ext. of duration of permission
Decided05 February 2014
Application typeExtension Of Duration Of Permission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Horizon Logistics Park, Harristown, St Margarets, Swords, Co Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW24A/0253EThe proposed development will consist of: 1) the demolition of existing cattle pen and hard standing area (total 911m2) and the removal of 1 no. existing gated site entrance from the South Parallel Road (R108), and the construction of a westwards extension to the existing Holiday Blue Long-Term Car Park to provide an extended surface car park which will comprise 950 no. airport staff car parking spaces, of which 48 no. will be provided for Persons with Reduced Mobility (PRM) and 96 no. will be serviced by Electric Vehicle (EV) charging points, to be accessed off the South Parallel Road (R108) via an upgraded existing former temporary construction access/egress, with an emergency access also to be provided through the existing Holiday Blue Long-Term Car Park immediately east of the proposed development site via a tie in, with security barriers, to the existing internal roundabout; 2) 30 no. bicycle spaces; 3) 1 no. new bus shelter; 4) new internal road layout, with set down areas for buses and footpaths, incorporating 2 no. existing culverts (one of which is to be extended) and 1no. new culvert over the Santry River; 5) proposed riparian corridor either side of the Santry River; 6) 1 no. single-storey substation; 7) 1 no. new single storey welfare building; 8) 1 no. new single-storey security hut with security barriers; 9) new foul and surface water drainage system works incorporating attenuation; 10) the erection of CCTV equipment, security fencing, electrical enclosure, lighting, signage, and boundary fencing; and 11) all other associated site development works, including temporary construction compound, and all hard and soft landscaping. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted to the planning authority with the application. / 0.2 km away / 08 August 2024Refused
- FW19A/0148Refurbishment and extension of the house and former stables to compris / 0.7 km away / 30 October 2019Refused
- F17A/0026The construction of a new 2 storey 4 bedroom detached dwelling (213sqm / 0.8 km away / 20 September 2017Refused
- F17A/0027The construction of a new 2 storey 4 bedroom detached dwelling (213sqm / 0.8 km away / 14 March 2017Refused
- F03A/1302/E2Stables buildings and an animal sanctuary on 2 No. separate sites / 0.9 km away / 03 February 2012Refused
- F11A/0405Temporary retention permission for the period of 18 months consisting / 1.0 km away / 18 January 2012Refused
- F17A/0642A new 3 bedroom detached dormer type dwelling with upgraded site acces / 1.1 km away / 03 May 2018Refused
- F19A/0086A detached bungalow to rear of existing family home using existing veh / 1.1 km away / 02 August 2019Refused